Laserfiche WebLink
PART 1 DIVISION 8- DOORS & WINDOWS <br /> Nelson Orangery 9415.00 <br /> October 3, 1994 1 <br /> 08300. SKYLIGHTS <br /> A. MATERIALS <br /> 1. Provide and install custom aluminum framed cap-glazed skylight as indicated on the <br /> drawings. <br /> (a) Fnish: Shall be factory applied. Color to be selected by architect. <br /> (b) GIazW. Insulated glazing system-Unit thickness 1" <br /> 2. Exterior caps to be clad with copper snap-on cap. Provide means of preventing galvanic <br /> action between metals. Copper to be acid etched. <br /> B. SUBMITTALS <br /> 1. Submit shop drawings according to section 01300. <br /> 2. Submit samples of finish color,glazing and snap-on copper cover. <br /> C. GUARANTEE <br /> I. Skylight assembly to be guaranteed not to leak for a period of five years. <br /> 08600. WOOD WINDOWS AND DOORS <br /> A. ALL WINDOWS: The Contractor shall scrape all excess glazing compound from both the exterior <br /> and interior of windows before painting. This is to make a dean finish line between the glass and <br /> the frame. <br /> 1. Wood windows shall be Pella Architect Series. <br /> (a) Exterior Finish: Primed wood. <br /> (b) Interior Finish: Natural wood. <br /> (c) GlazIpq:5/8" InsulShield I.G. <br /> (d) Screens: Windows shall be supplied with Rolscreens. <br /> (e) : Supplied with finish to match existing. <br /> (f) Provide lite divisions as shown on drawings. <br />