Laserfiche WebLink
PROJECT MANUAL FOR THE NELSON ORANGERY (9415.00) <br /> PART 1 - SPECIFICATIONS <br /> DIVISION 0- Contract Requirements <br /> DIVISION 1 - General Requirements <br /> DIVISION 2- Site Work <br /> DIVISION 3- Concrete <br /> DIVISION 4- Masonry <br /> DIVISION 5- Metals <br /> DIVISION 6- Wood <br /> DIVISION 7- Thermal and Moisture Protection <br /> DIVISION 8- Doors and Windows <br /> DIVISION 9- Finishes <br /> DIVISION 15- Mechanical <br /> DIVISION 16- Electrical <br /> PART 2 - SCHEDULES <br /> Room Finish Schedule <br /> PART 3 - DETAIL DRAWINGS <br />