My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: sewer connection/availability
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
0420 Tonkawa Road - 05-117-23-32-0001
>
Correspondence
>
Re: sewer connection/availability
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:12:44 PM
Creation date
5/15/2019 1:07:08 PM
Metadata
Fields
Template:
x Address Old
Address
0420 Tonkawa Rd
Document Type
Correspondence
PIN
0511723320001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
View images
View plain text
O `a� O <br /> CITY of ORONO <br /> vs, !� Municipal Offices <br /> Street Address: Mailing Address: <br /> `9.kzsuog' 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> July 21, 1999 <br /> Donna Snyder <br /> Carlson Companies <br /> P.O. Box 59159 <br /> Minneapolis, MN 55459-8215 <br /> Re: Sewer Connection Charges, 420 Tonkawa Road (PINS 05-117-23 32 0001) <br /> Dear Ms. Snyder: <br /> City records indicate the above referenced property was not assessed for municipal sewer at the time <br /> sewer was installed in Tonkawa Road in the mid 1970's(please see attached letter from City Planner <br /> Alan Olson dated 8/12/81). This property was at the very end of the sewer line at that time and <br /> apparently was either considered as not abutting it, or was given the choice to 'opt out'. Note that <br /> since that letter,the property has been incorporated into the Urban Service Area;this occurred when <br /> sewer was extended to the West Lake Street neighborhood in 1992. <br /> Properties which are now connecting to sewer but which never were assessed originally for the costs <br /> of the sewer, are required to pay a Sewer Connection Charge at the time of connection. Per the <br /> attached excerpt from the 1999 City Fee Schedule, the amount due for connection to the 1973-1 <br /> sewer lines is $12,590. <br /> Additionally due prior to connection is the Metropolitan Council Wastewater Services$1,050 Sewer <br /> Availability Charge(SAC)which is a pass-through fee(collected by the City and forwarded to Met <br /> Council). This charge is due for each new residential connection to the Metro sewer system. <br /> Please forward payment in the total amount of$13,640 payable to the City of Orono.If you have any <br /> questions,please feel free to contact me at 612-249-4600. <br /> Sincerely, <br /> Michael P. Gaffron <br /> Senior Planning Coordinator <br /> encl. <br /> Telephone(612)249-4600 • Fax(612)249-4616 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).