Laserfiche WebLink
MINUTES OF THE REGULAR ORONO COUNCIL MEETING <br />HELD JUNE.8,.1992 <br />( #13) PREPARATION OF PLANS AND SPECIFICATIONS FOR RECONSTRUCTION <br />OF LEAF STREET - RESOLUTION #3133 <br />Moorse explained this is a request for. author 1zatIon from the <br />Council ,to ' move ahead in the preparation of plans and <br />specifications for reconstruction of Leaf Street. <br />Cook'explained that the portion of'Leaf Street reconstruction will <br />be removed from the sewer bid and constructed with MSA funds. He <br />noted they are looking at a couple of options, an urban /rural <br />section or a total rural section. The street would be <br />approximately 32' when finished. <br />Butler asked how wide the road is currently. <br />Cook said it i s' 21 -22' , with the shoulder areas i n ' I i eu of curb and <br />gutter. He`noted the shoulder -to- shoulder width of. the road As <br />26'. He added the reconstruction would involve Leaf Street from <br />County Road 84 to Watertown Road. <br />Butler reported that. MSA funds can only be used Jf the road `. <br />connects`to another.MSA street or State Highway. <br />Cook noted that the sewer.construction will impact the vegetation <br />in the area more than the street reconstruction. <br />Jabbour asked the width of the existing right -of -way. <br />Cook said the right -of -way is 66' wide. <br />Jabbour stated that no one wants to encourage the widening of a <br />roadway. He asked Cook what the residents in the area would be <br />saving by using MSA funds.- <br />Cook explained there is an approximate $100,00 difference. He <br />noted the road constructed to MSA standards would cost more because <br />of the additional amenities. -He indicated that the City could <br />apply for a variance 'to the road standards that would allow <br />construction at a 28' width. <br />Butler felt they should apply for the variance. She asked if. they <br />would be able to box the sewer. construction to stay within the <br />right -of -way. <br />Cook noted.they would be using this method as often as possible. <br />Goetten said she assumed this project would.be done in a timely <br />mariner. <br />E� <br />