Laserfiche WebLink
t <br />MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD : 1`: SEPTEMBER 11, 1995 <br />(#6 - #2045 John Steinmetz - Continued) • <br />The applicant was present. <br />Hurr inquired if the County had the adequate right -of -way. Mabusth said the County did <br />have the adequate right -of -way with 66, adding that most of the road is located on the <br />east 33'. Mabusth said Dave Zetterstrom from Hennepin County was unable to give any <br />minimum setback from the road but did say the distance from the traveled road was <br />adequate. <br />Callahan noted that an adjustment was made at the Planning Commission regarding the <br />size of the porch. Mabusth said the porch was to be 8' with 10' at the roof line with a 2' <br />overhang and located at the 0' lot line. <br />Hurr moved, Callahan seconded, to approve Resolution 93598. <br />( #7) #2048 JAMES & JOANN JUNDT, 1400 BRACKETTS POINT ROAD - <br />CONDITIONAL USE PER IlTiVARIANCE - RESOLUTION #3599 <br />Scott Crawford of Kraus Anderson Construction represented the applicants. <br />Mabusth reported that the application is for a third residential unit in the oversized <br />accessory structure for a studio apartment, which already contains a 3- bedroom, 2- level, • <br />caretaker unit and a 2- bedroom guest house. The one room studio will bring the total <br />bedrooms to six, all of which will be served by one septic system. <br />The application was approved by the Planning Commission with conditions placed on the <br />septic systems. The sewage system was to have been updated by the 1995 construction <br />season. A petition for sewer is under consideration. The Planning Commission has asked <br />for septic testing every two months. If failure is found, the system must be pumped out <br />on a regular basis. Limitations would be placed on the property should this fail. <br />Kelley asked if Staff knew where the septic tank was located. Mabusth said they did, and <br />it has been found not to meet the separation required. Tests have been conducted to <br />show there is adequate area to serve the usage. Kelley asked what would occur if the <br />MUSA line is not extended to this area. A new septic system would be installed. <br />Mabusth suggested stipulating a deadline date for installation of septic should the MUSA <br />line amendment fail. Callahan asked if the applicant agreed to update the septic in the <br />original resolution. Mabusth said this was true. Callahan said no deadline should then be <br />needed. <br />Hurr asked what kind of septic was on the site at present. There are two mound -type <br />septic systems, one for the main residence and one for the accessory structures. Four <br />septic sites were tested. Hurr asked if it is realistic to have six - bedrooms within the <br />accessory structure, and Mabusth said it was. • <br />4 <br />