Laserfiche WebLink
1 ' WIDE GAMBREL_ B N TRU TION <br /> 0 ARN I S C !� <br /> RONO CUP' <br /> TOOLS& MATERIALS REQUIRED: <br /> Hammer,Tape Measure, Power Saw,Level,Knife, Drill,3/8"Drill Bit, <br /> Chalk Line, Paint Brush, Paint, Step Ladder, Spackle, & Leveling <br /> CAUTION: WEAR SAFETY GOGGLES AT ALL TIMES. WHEN <br /> HANDLING TREATED RUNNERS,FOLLOW MANUFACTURER'S ,. <br /> RECOMMENDATIONS. <br /> THE FOLLOWING PICTURES SHOW A 10'X8'BARN BEING BU( <br /> FOLLOW THE DIRECTIONS FOR THE SIZE OF BARN YOU,P - F <br /> CHASED. <br /> NOTE: Due to the weight of the end walls & the floor, it wi1102 ° <br /> people to assemble them. sub �d <br /> NOTE: Storage Barn Builders of America manufactures the prefabricated Q%XIc)kage,whiolrot�tis o�front wall,back wall,and the contents shown in the <br /> above picture.An 10x4, 10x6,10x8,1 Ox 10,1 Ox 12, t Ox 14,and 1 0x1 6 stort Ilam cad 1*'built u3in `rfabricated end wall package.The store where you <br /> purchased the kit added the materials necessary to build the size you purchC59d.bo 'cu#ng is rouii'ed q I d e floor,side walls,and roof.The cuts are not difficult <br /> and are explained thoroughly in the instructions.Your storage barn kit is a WnLilac product`'IJpll lured products,they are built within tolerances.If like <br /> materials are not the same size or not exactly the same as called for in the instruction ey�I�3tjifwtthirl,th8' facturer's tolerances and will not affect the assembly <br /> of the building. The siding on the prefabricated end walls may not be even x3 Itaqw wbrlc T(12dxd tMh boards will cover any variation in the siding. <br /> IL <br /> A B <br /> B B vz <br /> AL <br /> B <br /> B B • n <br /> 10'x8' FLOOR PICTURED ., <br /> ( ) {ems[h floor by measuring corner to corner from the end <br /> ngers <br /> 1. CUT 2 white wood 2x6 FLOOR STRINGERS (A) that will fit of th s ' ,M AKING SURE THE STRINGERS ARE STRAIGHT. <br /> between the preassembled front and back walls. DO NOT CUT the Slide one of the stringers forward or backwards until the distance <br /> two 2x6 TREATED RUNNERS. from"1"to"2"measures the same as"3"to"4".If your tape measure <br /> isn't long enough to measure this you can use your chalk line as a <br /> CUT LIST Cut the following number of tape measure. <br /> FLOOR STRINGERS(A) FLOOR JOISTS(B) <br /> 10'x4-Cut 1-2x6x8'to 2-3'8 3/4". 10'x4'-Cut 3-2x6x10'to 9'8 3/4". <br /> 10'x6'-Cut 1-2x6x12'to 2-68 3/4". 10'x6'-Cut 5-2x6x10'to 9'8 3/4". <br /> 10'x8'-Cut 2-2x6x8'to 7'8 3/4". 10'x8'-Cut 7-2x6x10'to 9'8 3/4". <br /> 10'x10'-Cut 2-2x6x10'to 9'8 3/4". 10'x10'-Cut 9-2x6x10'to 9',8 3/4". <br /> 10'x12'-Cut 2-2x6x12'to 11'83/4". 10'x12'-Cut 11-2x6x10'to 9'83/4". <br /> 10'x14'-Cut 2-2x6xl4'to 13'83/4". 10'x14'-Cut 13-2x6x 10'to 9'83/4". B -110 <br /> 10'x16'-Cut 2-2x6xl6'to 15'8 3/4". 10'x16'-Cut 15-2x6x10'to 9'83/4". C A <br /> Place a mark at the midpoint of the two FLOOR STRINGERS(A). <br /> From this point, place a mark every 12" in each direction. Center 4.Cut and install the waferboard FLOOR SHEATHING(rough side <br /> FLOOR JOISTS (B)on the marks,between the FLOOR STRING- up) according to the drawings below for the size you are building. <br /> ERS(A),with the top of the 2x6's even,and nail each end with 3-16d Install the full 4'x8' sheets first, and then cut pieces.The FLOOR <br /> nails. SHEATHING should be even with the outside of the floor stringer, <br /> and hanging past the end of the FLOOR STRINGERS(A)by 15/8". <br /> (See the pictures in steps 5&8.)The ends of each floor sheet must <br /> A C end up on the middle of a floor joist except where the front and back <br /> wall will be installed. Nail the FLOOR SHEATHING to all of the <br /> FLOOR STRINGERS (A) & FLOOR JOISTS (B) every 8"with 6d <br /> BC nails.Level the floor at this time.If your site is level,the runners may <br /> sit directly on the ground. If not, place concrete blocks or 2x6x16" <br /> A treated blocks every 4' under the runners. NOTE: IT IS IMPOR- <br /> TANT THAT THE FLOOR IS LEVEL, OR YOU WILL HAVE <br /> ASSEMBLY PROBLEMS LATERII BACK <br /> 2. Cut the 2-2x6 TREATED RUNNERS (C) to the length of your BACK <br /> barn, example:10'4% cut them 6'. Place a mark at the midpoint of 2x8 <br /> the two runners.Lay the runners on top of the FLOOR JOISTS(B), 2'X6' <br /> 12"from the outside edge of the FLOOR STRINGERS(A).With the 2'X4' 4'x8' <br /> mark centered on the middle FLOOR JOIST(B),nail with 1-16d nail 4'x8' <br /> and nail 1-16d nail in the first and last floor joist. Turn the floor <br /> section over so the runners are on the ground. 10'x4' FRONT 10'x6' FRONT <br />