My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-005102 - utility shed
Orono
>
Property Files
>
Street Address
>
T
>
Togo Road
>
3640 Togo Road - 17-117-23-31-0047
>
Permits/Inspections
>
1994-005102 - utility shed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:36:31 PM
Creation date
4/24/2019 1:11:34 PM
Metadata
Fields
Template:
x Address Old
House Number
3640
Street Name
Togo
Street Type
Road
Address
3640 Togo Road
Document Type
Permits/Inspections
PIN
1711723310047
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16: You are now ready <br /> to shingle the roof.Felt L <br /> paper is not included and <br /> is not needed to keep <br /> the roof from leaking. <br /> Chalk a line on the roof <br /> sheathing 11 12"above <br /> the outside of the 1 x2 <br /> CORNER TRIM <br /> BOARDS (1), if your <br /> shingles measure 36" 17.At the bottom of the 1 x3(L)on the inside of the door,you will need <br /> long, or 12 3/4" if they measure 39 1/2". Start the first row of to install a barrel bolt.Attach the barrel bolt with 4 screws in the top 4 <br /> shingles upside down with the slotted part of the shingle up,with holes only, with the bottom of the barrel bolt 1/4" above the floor. <br /> the top edge on the chalkline.The shingles should overhang the Holding the door tight, slide the barrel bolt down until it touches the <br /> ends of the barn 1/40. Follow the instructions on the shingle waferboard floor sheathing and draw around it.Drill a 3/8"hole-in the <br /> package and the following pictures for installation.If your rows of center of the mark. <br /> shingles should become uneven, you may chalk a new line to <br /> straighten out the rows by measuring up from the top of the <br /> ` S <br /> comer board on each side an equal distance. <br /> 1/2 TAB 21/2 TA <br /> NOTE: It is easier to cut the shingles on the backside. <br /> 1. Row starter shingles. <br /> 2. Row A: Start with full shingle. <br /> Row B: Start with 12 tab. <br /> Row C: Start with full shingle. <br /> Row D: Start with 212 tab. <br /> 3. Repeat strep 2 until you reach the top.Face nail the row that <br /> bends over the first peak. Repeat for the other side of the <br /> barn. 18.Your barn is ready for painting or staining.An oil base primer and <br /> 4. Cut the cap shingles. two coats of house paint should be BRUSHED on the waferboard or <br /> 5. Install the cap shingles. T1-11 siding.An oil base stain may be used on the T1-11.To minimize <br /> 0 door warpage, paint the edges and backside of the door. Due to <br /> D settling, it may be necessary to level the barn so the door will hang <br /> straight,by blocking as needed under the runners on the front or rear <br /> C B A comers.If you have any questions on assembling your barn,please call <br /> 1-800-272-BARN. <br /> A 10 YEAR LIMITED WARRANTY <br /> Storage Barn Builders of America warrants its prefabricated storage barn kits when <br /> erected according to the instructions,kept properly painted and maintained for a period <br /> of 10 years,to replace the storage barn kit free of charge if any damage to the storage <br /> barn is directly caused by wind or snow loads.This does not include damage to the <br /> FACE NAIL door or door frame, delaminating siding and damage or loss of roofing materials. <br /> Storage Barn Builders of America does not agree to repair damage caused by flying <br /> 3 'wF 5 or failing objects,damage inflicted by others,damage caused by termites or rodents, <br /> damage caused by moving the storage barn or not keeping it properly leveled,damage <br /> to interior walls,ceilings,partitions,equipment or contents,cost of assembling the re- <br /> placement kit,cost of preparation of the site,or cost of furnishing or applying any paint <br /> or stain. THE FOREGOING WARRANTY IS MADE TO THE ORIGINAL PUR- <br /> CHASER ONLY(PROOF OF PURCHASE IS REQUIRED)AND IS EXCLUSIVE <br /> AND IN LIEU OF ALL OTHER WARRANTIES,WHETHER WRITTEN,ORAL OR <br /> IMPLIED(INCLUDING ANY WARRANTY OF MERCHANTABILITY OR FITNESS <br /> FOR PURPOSE).Warranties do not apply if alterations which affect the storage barn's <br /> reliability have been made.The liability of Storage Barn Builders of America,arising out <br /> of the sale, use or operation of the storage barn whether of warranty,contract,or <br /> negligence(including claims of consequential damages)shall not in any event exceed <br /> the cost of a replacement storage barn kit for the defective,damaged,or destroyed <br /> CAP SHINGLES storage barn as hereinabove provided and upon the expiration of the warranty period, <br /> 4 all such liability shall terminate. The foregoing warranty shall constitute the sole <br /> remedy of the purchaser and the sole liability of Storage Barn Builders of America. <br /> � t COPYRIGHT 1991.Storage Barn Builders of America,Sedalia,MO. <br /> All rights reserved. May not be reproduced in whole or in'part without written <br /> " av sG permission.Storage Barn Builders of America reserves the right to change design, <br /> materials,or specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.