My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00667 - attached deck
Orono
>
Property Files
>
Street Address
>
T
>
Thoroughbred Lane
>
2570 Thoroughbred Lane - 04-117-23-11-0016
>
Permits/Inspections
>
2016-00667 - attached deck
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:06:12 PM
Creation date
4/23/2019 11:39:21 AM
Metadata
Fields
Template:
x Address Old
House Number
2570
Street Name
Thoroughbred
Street Type
Lane
Address
2570 Thoroughbred La
Document Type
Permits/Inspections
PIN
0411723110016
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*Certification exemption:The certification of the plan by a licensed professional may be exempted by the city <br /> engineer if the project meets all of the following: <br /> 1)An existing survey accurately describes existing property conditions; <br /> 2) Proposed project exceeds the setback requirements by 150%; <br /> 3) Proposed project footprint does not exceed 200 square feet; <br /> 4) Evidence that the Average Lakeshore setback is met is provided; and <br /> 5) Information necessary to ensure the project conforms to City codes and ordinances, including hardcover, <br /> grading, and landscaping requirements is provided. <br /> Additional surveys may be required,depending on the nature and complexity of your project. <br /> Foundation survey: A foundation survey, when indicated on the building permit, shall be submitted upon <br /> completion of the foundation work for all buildings and all additions to buildings and include: <br /> 1. Verification of the lot dimensions, <br /> 2. Verification front, side, rear, lakeshore,and wetland setbacks, <br /> 3. Foundation elevation at the same locations depicted on the survey developed for the project. <br /> As-built survey:An as-built survey,where required,shall <br /> 1. Certify the final topography of the site; <br /> 2. Verify drainage patterns; <br /> 3. Verify hardcover calculations. <br /> 4. Certify all existing improvements <br /> Shoreline Setback _J StrUcture StrUcture Setback frorn <br /> Setback- Setback- • <br /> OH VVL Lot with Septic Lot with Sewer Septic Systeni <br /> Natural Environment(NE)Lakes 150 150 150 <br /> Lake Classen 974.5 <br /> Dickey Lake 985.5 <br /> French Lake <br /> North Basin 930.5 <br /> Sewage Lagoon 934.3 <br /> South Basin 930.0 <br /> Lydiard Lake 970.9 <br /> RecreatlOnal Dever-1 "MIR)Lakes 100 75 75 <br /> Long lake <br /> Mooney take 988.0 <br /> .Tanager Lake 929.4 <br /> ;',Hadley Lake Pl `° h 961:4 <br /> General Development(GD)Lakes 75 75 75 <br /> Forest Lake 929.4 <br /> Lake Minnetonka 929.4 <br /> Tributary Streams;;.' 100 75 75 <br /> Dickey Lake Creek <br /> Long Lake Creek <br /> Painters Creek (measured from top of bank) <br /> Stubbs Bay Creek <br /> Wolsfeld Creek <br /> Updated:August 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.