My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00667 - attached deck
Orono
>
Property Files
>
Street Address
>
T
>
Thoroughbred Lane
>
2570 Thoroughbred Lane - 04-117-23-11-0016
>
Permits/Inspections
>
2016-00667 - attached deck
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:06:12 PM
Creation date
4/23/2019 11:39:21 AM
Metadata
Fields
Template:
x Address Old
House Number
2570
Street Name
Thoroughbred
Street Type
Lane
Address
2570 Thoroughbred La
Document Type
Permits/Inspections
PIN
0411723110016
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Survey & Site Plan Requirements <br /> a � <br /> Planning &Zoning Department 952-249-4620 <br /> www.d.orono.mn.us <br /> v <br /> ESH0 <br /> Any building,zoning or general permit application for construction of a new structure, or expansion of an existing <br /> structure or land alteration shall be accompanied by a certificate of survey or site plan drawn to scale prepared by a <br /> person registered by the Minnesota Board of Architecture, Engineering, Land Surveying, Landscape Architecture, 11 <br /> and Interior Design.All surveys* shall be certified by a Minnesota Registered Land Surveyor.Surveyors, Engineers or <br /> Landscape architects may certify site or grading plans. A certificate of survey or site plan shall conform to the City of <br /> Orono Survey and Site Plan Requirements. <br /> Three(3)original,scaled copies and a digital copy of a certificate of survey or site plan, meeting all of the <br /> following requirements. The scale shall be of sufficient clarity to indicate the nature and extent of the proposed <br /> work. The survey or site plan shall include the following: <br /> Administrative Data <br /> 1. The name and registration number of the surveyor;date of survey, north arrow,graphic scale. <br /> 2. Legal description and address of the property, <br /> 3. Total lot area in square feet. <br /> 4. Permanent iron monuments must be in place at each property corner and depicted on the survey. <br /> 5. All existing easements. <br /> Site Information: <br /> 6. Location and elevation of any structures on adjacent properties within 50'of lot lines. For lakeshore lots,the <br /> principal structure on each adjacent lakeshore lot and average Lakeshore setback must be shown. <br /> 7. Primary and alternate drainfield area corners and tank locations(staked in field). <br /> 8. All trees over 6"diameter within proposed disturbance area(s) and within 75' of the OHWL <br /> 9. Storm utilities including drainage ways, storm sewers, culverts, catch basins, and drain tile stubs with invert <br /> elevations. <br /> 10. Topographic contours at 2' contours on the entire lot (Lakeshore, 1') and 50' outside of lot lines. Identify all <br /> steep slopes over 12%.The source for all topography must be indicated on the survey. <br /> 11. Elevations to sea level datum of the top of curb,or if no curb,the edge of the pavement of the street at points <br /> where the side lot lines of the property intersect said street. <br /> 12. Identify top of bluff, bluff setback,and bluff impact zone. <br /> 13. Wetlands and wetland setbacks. <br /> 14. Service utilities (water,gas,electrical,and sanitary sewer with invert elevation at connection point) <br /> 15. Established high water elevation and structural setback from the Ordinary High Water Level (OHWL) for <br /> properties adjacent to lakes, ponds,streams or wetlands, <br /> 16. 100 year flood elevation. <br /> 17. Stormwater Quality Overlay District Tier(page three of this packet). <br /> 18. Hardcover calculations. Provide using the City's calculation sheets. <br /> Project Information: <br /> 19. All proposed improvements with dimensions. <br /> 20. Landscaping, and/or stabilization of disturbed areas. <br /> 21. Proposed surface drainage (1' contours on lakeshore properties, 2'on all others), indicate with arrows. <br /> 22. Slope of driveway in percent of grade. <br /> 23. Elevations to sea level datum of the top of foundation at each transition,garage floor,the first floor and lowest <br /> floor at all structure corners, and top and bottom elevations for all walls. <br /> 24. Erosion control, construction access, and soil stockpile during construction. <br /> Updated:August 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.