My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-009589 - new septic system
Orono
>
Property Files
>
Street Address
>
T
>
Thoroughbred Lane
>
2460 Thoroughbred Lane - 04-117-23-11-0014
>
Septic
>
1997-009589 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:06:04 PM
Creation date
4/22/2019 12:04:01 PM
Metadata
Fields
Template:
x Address Old
House Number
2460
Street Name
Thoroughbred
Street Type
Lane
Address
2460 Thoroughbred La
Document Type
Septic
PIN
0411723110014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> • � r <br /> G. DOWNSLOPE DIKE WIDTH <br /> 1. If landslope is 2.9 % or less adsorption width inculdes both upslope and <br /> dow-nslope widths <br /> 2. Calculate Minimum mound size bsaed on geometery: <br /> a. Determine depth of clean sand fill at upslope edge of rock layer: <br /> Separation J- �r feet <br /> b. Multiply rock layer width by landslope 1 root cover <br /> to determine drop in elevation; t root Ro ad <br /> Slope Difference separation feet <br /> x - %+ 100 = - feet Upslope width s1ov. Difference t <br /> c. Add depth of clean sand for separation (2a) �-�-feet <br /> p p Rock Bed width/n <br /> at upslope edge,depth of rock layer (1 foot) to �feet Downslope width <br /> depth of cover(1 foot) to find the mound height at the - <br /> teat <br /> upslope edge of rock layer; /.S ft+ lft+ lft= 3•-< feet <br /> P Pe g Y � <br /> h landslope and upslope dike ratio. <br /> d. Enter table�nnt pi <br /> Select dike multiplier of 9 <br /> e. Multiply dike multiplier by upslope mound height to find <br /> upslope dike width: 3 .S x�_= 1�- _feet <br /> P Pe <br /> f. Add depth of clean sand for slope downslope e difference (2b) at <br /> P P Pe edge, to <br /> the mound height at the upslope edge of rock layer(20 to find the <br /> downslope height; ft+- ft = feet <br /> g. Enter table with landslope and downslope dike ratio. <br /> Select dike multiplier of <br /> h. Multiply dike multiplier by downslope mound height to get <br /> downslope dike width: 'x-- - - = feet <br /> i. Minimum mound width is the sum of upslope dike width plus rock <br /> layer width plus downslope dike width; <br /> feet <br /> UDslope W1Eth <br /> j. Subtract the minimum width (2.0 from the 1 feet <br /> _ . <br /> adsorption area (F.4) to find the additional Reck Sep Width <br /> downslope area for adsorption ( )otsl�r..t <br /> upslope wlotn uvsl pe Width <br /> ft 7. ft= feet ;.� i -feet feet <br /> k. Add the additional width (2.j ) to the M <br /> downsolpe width and recalculate ' E <br /> Downslope Width <br /> the total width f'•` <br /> eft+lft + IL4 _ft= feet <br /> E <br /> 1. Total mound length is the sum of € <br /> upslope dike width plus rock laver length <br /> plus upslope dike width: <br /> Total Length <br /> 14ft+_Ja5�_ft+ _ftfeet <br /> Downslope UPSIOPe <br /> 3:1 4:1 5:1 6:1 7:1 3:1 4:1 5:1 6:1 7:1 8:1 <br /> I <br /> %slope <br /> 0 3.0 4.0 5.0 6.0 7.0 3.0 4.0 S.0 60 7.0 8.0 <br /> 1 3.09 4.17 516 6.35 753 2.91 3.85 4.76 5.66 634 7.41 <br /> 2 3.19 435 556 6.& 8.14 183 3.70 454 536 614 6.90 <br /> 3 330 454 5.88 7.32 6.86 275 357 435 5.05 5.79 6.4.5 <br /> 4 3A1 4.76 625 7.89 9.72 2.68 3.45 4.17 4.84 5.46 6.06 <br /> 5 353 5.00 667 6S. 10.717 2.61 333 4.00 4.62 5.19 51-1 <br /> 6 3.66 5.26 7.14 935 12.07 234 31:1 3.85 4.41 4.93 SAl <br /> 3M 556 7.69 :034 13.73 2.48 3.12 3.70 4Z3 4.70 5.13 <br /> 6 3.95 5.88 833 1154 15.91 242 3.03 3.5� 4.05 4.49 4.88 <br /> 9 4.11 615 9.09 13.04 18.92 2.36 294 3.45 3.90 430 4.65 <br /> 10 429 667 10.0 15.00 2333 2.31 2.86 333 3.75 4.12 4.44 <br /> 11 4A6 7.14 11.11 1755 30.43 226 278 323 3.61 3.95 426 <br /> 12 4.69 7.69 12.50 21.43 33.75 2.21 27C 3.12 3.49 3.80 4.08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.