My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-15-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
04-15-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2019 10:44:16 AM
Creation date
4/16/2019 9:41:37 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date Application Received: 03/06/19 �O1 VO <br /> Date Application Considered as Complete:03/15/19 <br /> 60-Day Review Period Expires: 05/14/19 <br /> y � <br /> To: Chair Thiesse and Planning Commission Members < o� <br /> Dustin Rief, City Administrator �krSi-I <br /> From: Melanie Curtis, Planner WOG <br /> Date: 15 April 2019 <br /> Subject: #LA19-000019, Chris Lake o/b/o Brackett Point Property, LLC, <br /> 1400 Bracketts Point Road, <br /> CUP—Guest House& IUP—Export 500+cubic yards of material <br /> Public Hearing <br /> Application Summary: The applicant is requesting approval of an IUP to support the export of <br /> over 500 cubic yards of material from the site and soil disturbance in excess of 50 cubic yards <br /> within the 75-foot setback in conjunction with construction of a new residence; and a CUP for <br /> a guest house use. <br /> Staff Recommendation: Planning Department Staff recommends approval with conditions. <br /> Background <br /> The applicant is requesting approval of an interim use permit (IUP)to allow the export of <br /> approximately 9,500 cubic yards of material; and disturbance of approximately 5,800 cubic <br /> yards of material within the 75-foot setback to facilitate the construction of a new residence on <br /> the property. Additionally,they seek approval of a guest house conditional use permit(CUP)to <br /> allow a new guest house use. <br /> Section 78-305 -Lot Area/Width: <br /> LR-1A Lot Area Lot Width <br /> Required 87,120 s.f. (2.0 acres) 200' <br /> Actual 230,852 s.f. (5.3 acres) +600' <br /> Applicable Regulations: <br /> Guest House CUP (Section 78-305) <br /> The applicant is requesting a CUP to permit a guest house use on the property.At 5.3 acres,the <br /> property meets the requirement for twice the LR-1A minimum lot area to support a secondary <br /> dwelling use/guest house.The proposed guest house will have a 2,182 square foot footprint <br /> where a single 2,200 square foot oversized accessory building (OAB) is allowed, based on the <br /> property's size. <br /> Interim Use Permit (Code Section 78-1726(a)(6)) <br /> The construction of a new residence on the property will result in 9,500 cubic yards of unneeded <br /> material. The applicant proposes to export this material from the site;they have indicated that <br />
The URL can be used to link to this page
Your browser does not support the video tag.