My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-15-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
04-15-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2019 10:44:16 AM
Creation date
4/16/2019 9:41:37 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Concept Review— Narrative — EISINGER FLATS <br /> E. Site Utilities <br /> As originally planned for in the approved Eisinger Meadows,we will be requesting the City <br /> proceed with construction of sanitary sewer and watermain from near Old Crystal Bay Road, <br /> westerly to serve both Eisinger Meadows and Eisinger Flats. The proposed Site and Utility <br /> Plan show connecting to these services. <br /> F. Stormwater Management <br /> The Eisinger Meadows Villas project has planned to construct stormwater management ponds <br /> on the west side of the project as shown on the Grading Plan. The Eisinger Flats project will <br /> propose to install an underground stormwater management system within the parking lot <br /> between the two buildings to treat the stormwater per City and MCWD regulations. This <br /> underground system will then direct water through the proposed Eisinger Meadows pond prior <br /> to entrance into the wetland. <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.