My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-15-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
04-15-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2019 10:44:16 AM
Creation date
4/16/2019 9:41:37 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• There are also woodlands in the SW and NE areas of the site; the tree preservation <br /> and Conservation Design report will address this site characteristic. <br /> • The total length of the shoreline, applying the LMCD definition of the line of contact <br /> of the body of water in the lake with the non-linear shoreline is 619+/-ft.; Lot 6 is <br /> 211+/-ft., Lot 5 is 206+/- ft., and Lot 4 is 202+/- ft. The two required shoreline <br /> distances for each lot, applying a linear point to point evaluation standard for an <br /> authorized dock for each lot are, 200 feet at the lake shore and 200 feet at the 75 <br /> foot setback from the lakeshore. These two requirements are met for new lots 5 and <br /> 6; for Lot 4 the 200' at the 75' setback is met and 92.5 % of the 200'requirement at <br /> the lakeshore is met (185'). This reduced length for lot 4 is due to the application of a <br /> linear evaluation requirement to a non-linear condition. Seasonal docks for all three <br /> lake lots are therefore justified. <br /> • A proposed Average Lakeshore Setback approach is indicated on the Preliminary <br /> Plat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.