Laserfiche WebLink
WILLOW BAY SANCTUARY PRELIMINARY PLAT PROJECT NARRATIVE <br /> • Executive Summary-This Preliminary Plat implements the land use direction and <br /> objectives of the Comprehensive Plan; all lots meet the area, set back and buffer <br /> requirements. In addition, with the implementation of the requested connections to <br /> City sanitary sewer and water in combination with the storm water management <br /> facilities and BMP's typically required with MCWD review and approval, the water <br /> quality of Long Lake, currently assigned a grade of D, will be measurably improved. <br /> • The Details- <br /> • Eric and Andrea Larson are requesting a review of a Preliminary Plat for a residential <br /> development at 690 N. Brown Road, PID # 3411823120007, a 24.37 acre parcel <br /> immediately adjacent to and with lake shore on Long Lake. The development <br /> objectives are to achieve a reasonable density given the site characteristics and <br /> achieve the highest and best use of the property. <br /> • The proposed Preliminary Plat includes a total of 7 lots, 6 new lots (2 new lake <br /> shore) for single family homes, and 1 lake shore lot with an existing single family <br /> residence and one seasonal dock. The driveway for the existing residence will be <br /> removed and relocated to intersect the new roadway. <br /> • A single roadway access from Brown Road, aligned across from the entrance to the <br /> Sugarwoods development is proposed with a cu-de-sac This new roadway is <br /> proposed as a 7 ton, 24' width private road with an HOA responsible for snowplowing <br /> and maintenance; the HOA will also be responsible for the maintenance of the <br /> MCWD mandated storm water facilities on the project. <br /> • There are extensive wetlands on the property, which constitute 14.3% of the land <br /> area, not including the required buffers, and an unnamed water source in the north <br /> central part of the site. These have been delineated; the delineation was completed <br /> by Sambatek via their report dated July 7, 2016; the delineation is current. This <br /> report was submitted to MCWD for field verification and acceptance. This action was <br /> suspended and will be resumed with this application and field verified in the spring of <br /> 2019, when the growing season returns. <br /> • Sanitary sewer and water services are proposed as connections to the existing City <br /> utility services in Brown Road; this approach was selected due to the <br /> environmentally sensitive nature of the parcel and the adjacent lake, with a current <br /> lake quality grade of D. The grade differential will probably require a lift station with <br /> an emergency generator. Construction is planned for the early summer of 2019 with <br /> lots ready for home builders by August 2019. . <br /> • Park dedication is proposed as cash in lieu of land, one park dedication credit for the <br /> existing residence is requested. <br /> • Small utilities will be serviced by a joint trench using services now available on <br /> Brown Road, including three phase power for the lift station. <br />