My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
S
>
Sussex Road
>
3120 Sussex Road - 04-117-23-32-0009
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:11:54 PM
Creation date
4/10/2019 10:31:44 AM
Metadata
Fields
Template:
x Address Old
House Number
3120
Street Name
Sussex
Street Type
Road
Address
3120 Sussex Rd
Document Type
Septic
PIN
0411723320009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�e minary Plat of Fox Bend - Septic System Testing <br /> u t 22, 1989 <br /> �g 4 of 4 <br /> i <br /> al Cc�nents - <br /> Each proposed lot appears to have suitable primary and <br /> �t rnate drainfield sites. On some lots, the primary and <br /> lt nate sites shown are the onl possible sites available. On <br /> th lots, it is likely that additional testing could find a <br /> �lm r of potential sites, al lowing additional f lexibility in <br /> qu placement. <br /> In each case, drainfield sites have been designed to meet <br /> he inimum 20' setback from property lines, and 75' setbacks <br /> ro designated wetlands. � <br /> On the majority of lots, estreme cantion must be taken <br /> ur ' g construction of improvements to the property. Road <br /> on ruction will take place within 50' of tested drainfield <br /> it on at least 6 of 17 lots, and on 2 lots the sites are <br /> e41 ively near the area proposed to be graded to provide a <br /> �'te tion basin. I would recommend that each lot have drainfield <br /> ijte protected by snow fence total ly surrounding the drainfield <br /> it at a distance 20' from the boundaries of each drainfield <br /> ys m. Additionally, when road construction plans are <br /> ub tted, I would like to review them to determine where road <br /> ut ould have a potential impact on drainfield sites. <br /> Out of 34 drainfield sites tested, 29 require mound systems <br /> d would allow a trench-type system. Each lot has primary and <br /> lt i nate sites designated. It would not be surprising if as <br /> ny s 20$ of the sites ultimately will have to be re-tested due <br /> o t e buyer's preference for house sites near or conflicting <br /> '�h rainfields. Some lots are extremely limited for potential <br /> �i field sites, others provide a degree of f Iexibility in house <br /> p �c ent. , <br /> iven the above facts, concerns, and constraints, I would <br /> r �o end approval of the subdivision as proposed. Accompanying <br /> t is emo is a topographic survey of the preliminary plat showing <br /> p te tial house Iocations and locations of both primary and <br /> a te ate drainfield sites. <br />
The URL can be used to link to this page
Your browser does not support the video tag.