My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-P10411 - new septic
Orono
>
Property Files
>
Street Address
>
S
>
Stubbs Bay Road North
>
300 Stubbs Bay Road North - 32-118-23-42-0005
>
Septic
>
2006-P10411 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:41:22 PM
Creation date
3/19/2019 1:21:31 PM
Metadata
Fields
Template:
x Address Old
House Number
300
Street Name
Stubbs Bay
Street Type
Road
Street Direction
North
Address
300 Stubbs Bay Road North
Document Type
Septic
PIN
3211823420005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Unlevel Pressure Distribution System Design - 10/25/04 <br /> 1. Lay out system in order of highest to lowest elevation <br /> Line 1 Elevation 997.9 ft Length 92 ft <br /> Line 2 Elevation 995.7 ft Length 92 ft <br /> Line 3 Elevatiqn ft Length ft <br /> Line 4 Elevati�n ft Length ft � <br /> Line 5 Elevation ft Length ft <br /> 2. Change in Elevation over the Trenches <br /> Highest elevation-lowest elevation: 997.9 - 995.7 = 2.2 feet <br /> 3. Total Head=head at orif'r�es(2ft)+change in elevation(2) 2 ft + 22 ft = 4.2 feet <br /> ("�f gneater than 5 feet modify design) <br /> 4. Calculate pressure head for each system <br /> 1. Highest Trench Elevation the Head=2 feet <br /> 2. Po+(E1 -Ex)=DEu <br /> Line�1 Elevation 997.9 2+ [E1 -E1]=2+[ 997.9 - 997.9 ]= 2.0 feet <br /> Line 2 Elevation 995.7 2+[E1 -E2]=2+[ 997.9 - 995.7 ]= 4.2 feet <br /> Line 3 Elevation 0.0 2+[E1 -E3]=2+ [ 997.9 - 0.0 ] = 0.0 feet <br /> Line 4 Elevation 0.0 2+[E1 -E4]=2+ [ 997.9 - 0.0 ]= 0.0 feet <br /> Line 5 Elevation 0.0 2+[E1 -E5]=2 + [ 997.9 - 0.0 ]= 0.0 feet <br /> 5. Determine flow rate per hole(See figure E-6) <br /> Line 1 Pres 2.0 Perf Diameter 7/32 = 0.80 gpm <br /> Line 2 Pres 4.2 Perf Diameter 7/32 = 1.18 gpm <br /> Line 3 Pres 0.0 Perf Diameter = gpm <br /> Line 4 Pres 0.0 Pert Diameter = gpm <br /> Line 5 Pres 0.0 Perf Diameter = gpm <br /> 6. Calculate flow for Line 1 <br /> Number of perforations- len th of pipe-2)/spacing]+1 <br /> [( 92 ft-2ft) / 3� ft]+1 = 31 perforations(Check figure E-4 to make sure it is ok) <br /> Flow= number of perforations x flow rate <br /> 31 pert x 0.80 gpm = 24.8 gpm <br /> 7. Calculate the gallons per foot for Line 1 <br /> Gallons/length= 24.8 gpm / 92 ft= 0.27 gpm/ft <br /> E� Perforation Dischar e in GPM E-4 Maximum Number of 1/4 inch perforations <br /> Pressure r lateral to uarantee<10%discha e variation <br /> Head Perforation Diameter in inches Perforation <br /> feet 1/8 3/16 7/32 1/4 Spacing <br /> 1 0.18 0.42 0.56 0.74 feet 1 inch 1.25 incl 1.5 inch 2.0 inch <br /> 1.5 0.22 0.51 0.68 0.90 2.5 8 14 18 28 <br /> 2 0.26 0.59 0.80 1.04 3.0 8 13 17 26 <br /> 2.5 0.29 0.65 0.88 1.17 3.3 7 12 16 25 <br /> 3 0.32 0.72 0.98 1.28 4.0 7 11 15 23 <br /> 4 0.37 0.83 1.13 1.47 5.0 6 10 14 22 <br /> 5 0.41 0.94 1.26 1.65 Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.