My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-P10411 - new septic
Orono
>
Property Files
>
Street Address
>
S
>
Stubbs Bay Road North
>
300 Stubbs Bay Road North - 32-118-23-42-0005
>
Septic
>
2006-P10411 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:41:22 PM
Creation date
3/19/2019 1:21:31 PM
Metadata
Fields
Template:
x Address Old
House Number
300
Street Name
Stubbs Bay
Street Type
Road
Street Direction
North
Address
300 Stubbs Bay Road North
Document Type
Septic
PIN
3211823420005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Balance flows for other lengths,spacing,or size <br /> Line 2 GPM =length of pipe x gallons per minute per foot(7) <br /> 92 ft x 0.27 gpm/ft = 24.8 gpm <br /> #of Perfs=GPM /flow rate(5.2) <br /> 24.8 gpm / 1.18 gpm = 21 #of Perfs (Check figure E-4) <br /> Spacing = (Length-2 feet)/(Number of perfs-1) <br /> ; <br /> ( 92 ft-2ft)/( 21 perfs- 1)= 4.5 feet <br /> �Line 3 GPM=length of pipe x gallons per minute per fodt(7) � <br /> 0.0 ft x 0.27 gpm/ft = 0.0 <br /> #of Perfs=GPM /flow rate(5.2) <br /> 0.00 gpm / 0.00 gpm = 0 #of Perfs (Check figure E-4) <br /> Spacing=(Length-2 feet)/(Number of perfs-1) <br /> ( 0.0 ft-2ft)/( 0 perfs- 1) = 0.0 feet <br /> Line 4 GPM =length of pipe x gallons per minute per foot(7) <br /> 0 ft x 0.27 gpm/ft = 0.0 <br /> #of Perfs=GPM /flow rate(5.2) <br /> 0 gpm / 0.00 gpm= 0 #of Perfs (Check figure E-4) <br /> Spacing=(Length-2 feet)/(Number of perfs-1) <br /> ( 0 ft-2ft)/( 0 perts- 1)= 0.0 feet E-20 Volume of Li uid in Pi <br /> Pipe Diameter Liquid per foot <br /> Line 5� GPM=length of pipe x gallons per minute per foot(7) inches allons <br /> 0 ft x 0.27 gpm/ft = 0.0 1 0.045 <br /> #of Perfs=GPM /flow rate(5.2) 1.25 0.078 <br /> 0 gpm / 0.00 gpm= 0 #of Perfs 1.5 0.11 <br /> Spacing=(Length-2 feet)/(Number of perfs-1) 2 0•17 <br /> ( 0 ft-2ft)/( 0 perfs- 1)= 0.0 feet 2.5 0.25 <br /> 3 0.38 <br /> 9. Ca�ulate total gpm&Calculate System loading 4 0.66 <br /> Pi volume(see frgu►�s E-20) x length <br /> Line 1 Flow= 24.8 gpm 0.11 gal/ft x 92 ft = 10.1 gal <br /> Line 2 Flow= 24.8 gpm 0.11 gal/ft x 92 ft = 10.1 gal <br /> Line 3 Flow= 0.0 gpm gal/ft x 0 ft = 0.0 gal <br /> Line 4 Flow= 0.0 gpm gal/ft x 0 ft = 0.0 gal <br /> Line 5 Flow= 0.0 gpm gal/ft x 0 ft = 0.0 gal <br /> Total= 49.6 gpm Tota1= 20.2 gal <br /> 10. Summary <br /> Pi Size Perf Size Spacing <br /> Line 1 1.5 in 7/32 in 3.0 ft <br /> Line 2 1.5 in 7/32 in 4.5 ft <br /> Line 3 in 0.00 in 0.0 ft <br /> Line 4 in 0.00 in 0.0 ft <br /> Line 5 in 0.00 in 0.0 ft <br /> 1 hereby tl�at I have cbmpleted this work in aocordance with all applicable ordinances,rules and laws <br /> � % ' ature) 810 (license#) 6/29106 (Date) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.