STORM WATER POLLUTION PREVENTION PLAN FOR
<br />RICHARD A. ZONA
<br />IN THE SW 1/4 OF SEG. 25-118-23
<br />HENNEPIN COUNTY, MINNESOTA
<br />i
<br />Y (984.7)
<br />STORM WATER POLLUTION PREVENTION PLAN BEFORE AND DURING CONSTRUCTION
<br />1. The following storm water pollution prevention measures are shown
<br />on the plans and shall be implemented prior to construction:
<br />* Install silt fence around the perimeter of areas to be graded as
<br />shown on the storm water pollution plan.
<br />* All temporary stockpiles must have silt fence around them to trap
<br />sediment.
<br />* Construct rock construction entrance at field entrance to site.
<br />* Phase grading work to minimize the duration that any disturbed soil
<br />is exposed.
<br />* Seed and mulch must be applied within 72 hours after rough grading is
<br />complete.
<br />* Locate stockpiles a minimum of 50 feet from ponds and site drainage routes.
<br />* Remove any sediment that has been tracked onto public or private streets
<br />within hours.
<br />* Remove any spill of fuel, oil, or other chemical immediately upon detection.
<br />* Store construction materials in an orderly manner.
<br />* Repair silt fences, rock construction entrances, and other erosion and
<br />sediment controls as needed.
<br />2. Storm Water Pollution Prevention After Construction
<br />The contractor shall implement the following storm water pollution prevention
<br />measures after construction:
<br />* All distrubed areas without permanent impermeable surfaces will be
<br />vegetated for final stabilization.
<br />* Silt fence and other erosion and sediment control devices will be removed
<br />after vegetation is established
<br />* Contractor shall maintain a construction activity log with dates of major
<br />grading activities, dates grading stops and spills.
<br />* Keep SWPPP and inspection log accessible on site.
<br />3. Notification
<br />* If the rock construction entrance is filled with sediment the contractor
<br />shall either replace the entrance or add additional rock with 24 hours of
<br />detection or notification
<br />* If sediment from the site is observed on adjacent streets or other properties,
<br />the contractor shall remove the sediment within 24 hours of detection or notification.
<br />* If sediment from the site is observed on adjacent streets or other properties, the
<br />inspector shall identify the source and discharge location of the sediment and instruct
<br />the contractor to implement additional erosion and sediment controls at those
<br />locations to prevent future discharges.
<br />* If building materials, chemicals, or general refuse is being used, stored, disposed
<br />of, or otherwise managed inappropriately, the contractor shall correct such defects
<br />within 24 hours of detection or notification.
<br />If the discharge has occurred on the property, the contractor shall remove the
<br />sediments and debris within 24 hours of notification and correct the source of
<br />such materials as directed by the inspector.
<br />DETAIL
<br />1 11=30'
<br />1 30
<br />o denotes iron marker
<br />908.3 denotes existing spot elevation, mean sea level datum
<br />908.3 denotes proposed spot elevation, mean sea level datum
<br />917- - denotes existing contour line, mean sea level datum
<br />denotes proposed contour line, mean sea level datum
<br />3E denotes proposed silt fence
<br />III
<br />PROPOSED Og +,,
<br />GJg...... ........... 1g96�1 :'Iz
<br />5X5' ENTRY 1g 0 o
<br />MONUMENTS � C�
<br />�0� (0 N
<br />•9g3 k � lg9Q' a N .. Q' �
<br />QO ••1
<br />O '
<br />,05
<br />.X99 tp 8 CERRY t
<br />_
<br />--- �,
<br />. , a' LE
<br />V(� 9°pA91 ✓' $. � � t ° p° PLE C �� Cop o
<br />2 M 24" A CI
<br />Ol Cry / a Q f Q D
<br />C,4 O
<br />SL
<br />30
<br />z
<br />78AK - do
<br />C}� 0
<br />19��D
<br />1014
<br />WOODAIL
<br />i
<br />W % l i i 1 Pd LE FENCE t
<br />1 0� la1
<br />-9, f o 1
<br />0, 10/
<br />lgay�l i 86 / ®o "F/1'
<br />PROPOS
<br />DRIVEW Y -P-
<br />Z CS cl1
<br />---- --- /.2" OPLE/ U
<br />!I '
<br />J / �� /
<br />No Q
<br />N � 30%� DRIVEWAY EASEMENT AS LISTED
<br />______ IN OLD REPUBLIC NATIONAL TITLE
<br />INSURANCE COMPANY COMMITMENT
<br />�_��\N �• �� N0. ORTE722900 DATED 10-7-09
<br />d j• II ��'
<br />0 3Q/
<br />Cry -
<br />10T EA
<br />N ACRS TOTAL o°
<br />ACRES EXCLUDING'RO D
<br />0 + 26"
<br />0 _ 0 WHITE
<br />\ 1 ��� o
<br />-_ -Y
<br />1 81RC Z `O
<br />`J _ N
<br />CJ �
<br />/ C
<br />i
<br />l l J 10" EL Y ��
<br />i
<br />O
<br />,2'
<br />cG. PINE
<br />N +\v O � O \'= � % \ POWER
<br />500''
<br />- / , ; �zo,. SET B K a, - _ �'r2 0 (AA.�` / )I / L f-- °k#xr INE 4" �r �1DI10�t
<br />i �' 4-
<br />Y� - a N N
<br />_
<br />,' � / --Jsz� _ � '�' �ir .� -�`" NOTE: GUT OFF EXISTING WYE
<br />/ N28' YnV�� DRIVEWAY TO ZONA PROPERTY
<br />I----T-=-�, i',,� c 0 O
<br />wooD
<br />p\ RAIL t
<br />rn
<br />W
<br />'o
<br />1 I FENCE
<br />OVER AD
<br />EXISTING WIRE I, BA woos
<br />GARAGE 3O
<br />k�r4'
<br />la_� 24.4 °
<br />'o g A ,16 PPLE
<br />�� -�V
<br />P�wEf? p,8 CE ,,, -
<br />PALE i ENCHMARK �....
<br />i
<br />j I � BA56 OOd
<br />'ELM OF WEL
<br />I
<br />�enswogo �� i • waTE (103 . -iOE C�
<br />30 ZA o o
<br />1Q3
<br />1.a
<br />,1
<br />- e )
<br />i
<br />,4 ELN �
<br />\ .I
<br />00
<br />V RITE* I IEL1 WHIT y ° )
<br />9AI( OAK O o `
<br />\
<br />I ` 22��
<br />'W4FE'I BA SW'OODV PROPOSED E NO3 \ N
<br />,
<br />.O K \ s � X477
<br />eAs��000 r� #�� z ,7 _ �10�� -1028-
<br />(Ja'� 6 EXIS �NO MAIN FE. 41 -�� �� 00 'f•.
<br />IIL
<br />A,._�
<br />HOUSE 100 1 3 C 1-0 E 5
<br />MAPLE LOW. _ Ln_
<br />8\\ELM �. iQ a 465 L 1019.=` a , .�J
<br />24
<br />eAssWep o'•,,
<br />ELM � Hi- -� -.00 ) O \ EXISTING
<br />��241�, ��HOUSEE TERR«�- Z 445K � - - � (fiWH26 f
<br />ON
<br />A\K .WHITE -�--. ^t •.
<br />\ 'OAK}L. L °-.,. OPEN PORCH
<br />WALL, 2 -
<br />-WH TE
<br />--
<br />1`
<br />� POOL
<br />�, 2�50t"
<br />30"
<br />�V\ ��SETBACK �Q/ -�
<br />',LINE, a'X,s 1 `�./
<br />HIKE _ 24 WHITE
<br />-WHITE _ -30
<br />O�K
<br />70
<br />\e_ R
<br />AU/L
<br />L_ `� I Ll meq cK - - - = -
<br />cs '
<br />ES - �7 N
<br />7 5"
<br />o LIN ---
<br />00. SETBACK - -E
<br />- -
<br />'
<br />LINE - 2°' - . _- -� K
<br />_ W'-" E 24"
<br />OA
<br />.. K -WHITE-
<br />_
<br />-
<br />-
<br />_
<br />(973 %h1 - - - - - -
<br />57 -
<br />i
<br />Z0 \
<br />-LNR V E y =--..
<br />' 970.9 - 975
<br />CONTOUR'
<br />--�
<br />LINE (OHW)
<br />PROPOSED ELEVATIONS (PER ARCHITECT)
<br />LYDIARD
<br />1) MAIN FLOOR - 1030.5
<br />1o31.2) LOWEST FLOOR - 1019.00 ,4
<br />o �
<br />3) GARAGE FLOOR-1030.33Oo ty
<br />LOT AREA - 282,105+- SQ.FT.
<br />TO THE OHW OF LYDIARD LAKE
<br />EXCLUDING SPRING HILL ROAD
<br />RIGHT OF WAY
<br />O
<br />0
<br />CP
<br />CP
<br />1�)N
<br />LAKE 0
<br />co
<br />• I
<br />I
<br />I
<br />C01
<br />0
<br />SOUTH LINE OF I
<br />GOVT LOT 5 67.85 DESC.
<br />_ _ _ I,R_"-_-•6 9.59 MEAS. .
<br />'N'
<br />SE COR
<br />------ 147.38 ..•........ ........ 341.7 ....... GOVT LOT 5
<br />MEANDER
<br />N 89��%42' 18" YY CORNER
<br />-".................................... 489.08_------------------......_._- _..... ----------------------:_:__:
<br />-mow..----.����,
<br />Temporary Erosion Control and Sequencing
<br />1. Instal 1perimeter control fencing per the standard detail plates. No more than
<br />600 linear feet of silt fence should be continuous and collecting at one point:_
<br />Undulate the silt fence or use "simles" or crescents of silt fence.
<br />2. Install a rock construction entrance per the standard detail plate. Rock pad
<br />exits are needed where the site exits to the private drive. Rock pads should
<br />be 3 inch rock, 6 inches deep, and 75 feet long and span the full width of the
<br />exit. Geotextile fabric should be placed under the rock.
<br />3. Use horizontal slope grading
<br />4. Install erosion control around any temporary dirt stockpile areas.
<br />5. All septic areas to be fenced off for protection. Protection to extend a
<br />minimum of 20' outside of septic areas.
<br />6. The contractor for the project shall inspect all erosion control BMP's after
<br />each rainfall and repair as necessary and remove sediment from silf fences
<br />if it reaches 1/3 capacity.
<br />7. The contractor shall schedule his operations to minimize the amount of
<br />disturbed area at any given time. The contractor shall limit his activities
<br />to the grading limits as shown.
<br />8. Remove all temporary BMP's once the site has reached final stabilization (a
<br />uniform perennial vegetative cover with a density of 70 percent over all pervious
<br />surface areas).
<br />Permanent Erosion Control
<br />1. All exposed soils on site must be stabilized with in 3 days:
<br />a. Stabilization on slopes flatter than 4:1 consists of disc -anchored
<br />mulch and seed; stabilization on slopes flatter than 4:1 and in areas
<br />of concentrated flows consists of erosion blankets and seed.
<br />2. Temporary mulch and seed is needed for exposed areas which sit fallow for
<br />3:1 or steeper in 7 days, 31 to 10:1 in 14 days, and flatter than 10:1 in 21
<br />days. Also open stockpiles need to have temporary stabilization if they are to
<br />remain inactive for more than 7 days.
<br />T-0 r -,a: rMOM
<br />Cir i.
<br />OF r;t`-. Yr.
<br />AEiC..JG'hSfYSf
<br />n.< ME N7 c;t- r::E'> ?sail.
<br />LTS�.^_PTIiES lf� �
<br />R E V S I O N S
<br />DESIGNED
<br />I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT
<br />WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION,_
<br />AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
<br />AND LAND SURVEYOR UNDER THE LAWS OF THE STATE OF
<br />MINNESOTA.
<br />11-11-09
<br />G RON B E RG & ASSOCIATES, INC.
<br />CIVIL ENGINEERS, LAND SURVEYORS, LAND PLANNERS
<br />445 N. WILLOW DRIVE LONG LAKE MN 55356
<br />952-473-4141 FAX: 952-473-4435
<br />DATE BY REMARKS
<br />SCALE
<br />1 50'
<br />7-20-10 NEW PROPOSED HOUSE AND DRIVE SHOWN
<br />..
<br />8-24-10 NEW CULVERT, ADD'L TOPO
<br />x S
<br />9-13-10 PROPOSED ENTRY MONUMENTS
<br />CHECKEDII
<br />t'-------------
<br />--------E-N:IS
<br />SHEET
<br />OFSHEETSPHONE:
<br />N;':"
<br />tnt:3..:'l::1i� c`.•'Fa .>i;33 ., >?=£'5i.Cf"r.S; E'',-
<br />A
<br />DATA FILES/10JOBS/10-000/10007A ZONA/7-19-10/10007A from 10007 drawing SWPPP 8-24-10.scj
<br />R E V S I O N S
<br />DESIGNED
<br />I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT
<br />WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION,_
<br />AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
<br />AND LAND SURVEYOR UNDER THE LAWS OF THE STATE OF
<br />MINNESOTA.
<br />11-11-09
<br />G RON B E RG & ASSOCIATES, INC.
<br />CIVIL ENGINEERS, LAND SURVEYORS, LAND PLANNERS
<br />445 N. WILLOW DRIVE LONG LAKE MN 55356
<br />952-473-4141 FAX: 952-473-4435
<br />DATE BY REMARKS
<br />SCALE
<br />1 50'
<br />7-20-10 NEW PROPOSED HOUSE AND DRIVE SHOWN
<br />DRAWN
<br />8-24-10 NEW CULVERT, ADD'L TOPO
<br />Joa No.
<br />10-007
<br />9-13-10 PROPOSED ENTRY MONUMENTS
<br />CHECKEDII
<br />DATE MINN. LICENSE NUMBER
<br />SHEET
<br />OFSHEETSPHONE:
<br />16 2010
<br />OF ORONO
<br />q{05
<br />l-� RECEIVED
<br />SEP 16 2010
<br />CIN 0F ORONO
<br />
|