Laserfiche WebLink
RECEIVED <br /> , . , <br /> JUL 19 2016 <br /> EROSION CONTROL SUPPLEMENTAL INFORMATIOI��If�ORONO <br /> INSPECTION PLAN REQUIREMENTS <br /> 1. Routine Inspections: <br /> • Once every seven days during active construction <br /> • Within 24 hours of a half inch or more precipita.tion <br /> 2. Completed Field Iaspection Reports: <br /> • Reports available within 24 hours of request until MCWD determines project is complete& <br /> stabilized <br /> Failure to submit requested inspection information widd result in a site inspection and may be subject to <br /> rermbursement for MCWD sta,ff time. <br /> Who will inspect your site regularly? <br /> NAME: '�'?� h ORGAIVIZATION: � h�-�w I�,�' <br /> PHONE: t!j I Z�U Z��O ALTERNATE PHONE: �2"��(.D-0�'C,�(L'�- <br /> EMAIL: _P,•In C�'1 G� ��I18�►-�¢-c I�G-Law�, <br /> Where is the concrete washout location? <br /> �OFF SITE OR CONTAINED ON TRUCK <br /> ❑ 1NDICATED ON SITE PLAN(with required impermeable liner) <br /> ❑ N/A <br /> What is the final stabilization method? <br /> {seed,sod,etc.): <br /> 6 inches of topsoil must be added/replaced prior to final stabilization <br /> Will protective fencing for retained vegetation be installed? <br /> �F'"YES <br /> ❑ NOT APPLICABLE <br /> ❑ OTHER(deseribe) <br /> I certify that I am familiar with the requirements of the MCWD Er�ion Control Rule and that the <br /> proposed a ' '�� pliance with this rnle. <br /> .�- i/ � <br /> ignature o App cant o thorized Agent Dat <br /> MINNEHAHA CREEK <br /> WA7ERSHED DISTRICT <br /> OVAIqY OP WATlR,OWIITY OP LIRf <br />