Laserfiche WebLink
WATER/SANITARY SEWER <br /> City water and Metropolitan Council sanitary sewer services will likely be accessed from Kelley Parkway. The <br /> developer will be utilizing Carlson McCain to provide civil engineer services and civil plan design. A survey is <br /> currently being conducted to confirm the location and size of utilities. As this project progresses,the <br /> developer will provide additional details and updates. <br /> STORM WATER&GRADING <br /> Today,the existing grade generally flows from the northeast(1022'estimated elevation)to the southwest <br /> (1010'estimated elevation). The developer anticipates the existing regional Stonebay stormwater pond <br /> located immediately west of the subject property was built with capacity to serve this project. Additionally, <br /> the developer anticipates the need to construct a pre-treatment stormwater basin,on the subject property, <br /> that will feed into the existing regional Stonbay stormwater pond. The developer will be utilizing Carlson <br /> McCain to provide civil engineer services and civil plan design. As this project progresses,the developer will <br /> provide additional details. The developer has generally discussed the above assumptions with the <br /> Minnehaha Creek Watershed. <br /> WETLANDS <br /> The developer has engaged Kjolhaug Environmental Services to conduct a wetland delineation for the subject <br /> property. A very small,unintended, man-made wetland was identified on the subject property(0.141 acres). <br /> Said delineation was sent to the Minnehaha Creek Watershed for review and is anticipated to receive a <br /> Notice of Decision in February as follows:"MCWD approves the boundaries and types and incidental status <br /> for the four wetlands identified in the application. This decision is valid for five years." The Army Corps of <br /> Engineers is also reviewing said wetland delineation and will provide a determination(expected in March). <br /> Page 8 of 8 <br />