My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-007015 - replacement system
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
4185 Sixth Ave N- 31-118-23-11-0004
>
Permits/Inspections
>
1995-007015 - replacement system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:28:21 PM
Creation date
2/13/2019 11:35:16 AM
Metadata
Fields
Template:
x Address Old
House Number
4185
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
4185 6th Avenue North
Document Type
Permits/Inspections
PIN
3111823110004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, . ` , <br /> � <br /> DESIGN REQUIREMENTS <br /> Considerin�;the soil data and minimum design requirements of the Septic System Qrdir�ance, our <br /> proposal is as fol}ows: <br /> Construct a Mound System based on an estimated water usage of 3Q0 gallons per day. <br /> 30U gpd= 300 sq. ft. bed area-miniEn�n because of the lack of a seconclary site. <br /> Design Size 1Q' x 3Q' rUck beci= 3U0 sq. ft. bed area with a do��--nsto�of 17", sideslop�:s of 13'. <br /> 2- 10U0 gal. tank <br /> l- 700 gal. pump ta.nk <br /> CONSTRUCTIQN PR4CEDUItE FOR A SEWAGE'TI2EATMEN'T 1VI4UlYD <br /> Soi! Surface pre.parati�:a <br /> A 2 inch discharge pipe frozn the pump to end of the mound area shall be tnstatled prior to soil <br /> surface preparation. If this supply line is less than 3.5 feet deep it must be insulated to the <br /> equivalent of 3.5 feet. The trench e�cavated to install the discharge pipe shall be carefuity <br /> backfilled and compacted to prevent seepage of ef�luent. <br /> The total area s�1�Gte� for the mc�unci, incltading thZt t�nci�r th�clike�, �h�til b� m���hen�� in orcl�r <br /> to thcr�ughly break up any existing sod iayers and ta �ravidc;a su;tah�c transition zanc between <br /> the original soil and the sand layer oF the mound. The area st�all be roug}�ened only wt�er� the <br /> moisture content of the soil 8 inches below the surFac�e. is drier than the ptastic ii�nit. The ptastic <br /> limit is the soil moisturc content bciow�vhich the soil may be manipulated for purposes of <br /> instalting a soii treatmeriE system, a►�u above which r��ani�uiatiori will cause cotn�iactiu�► and <br /> puddling. Surface preparation or scarification wil! he performed�vith a back-hoe bucket. There <br /> shall be no dead furraw in the mound construction area. <br /> Mound construction shatl proceed immediately after surface prepa.ration is completed. Every <br /> effort should be taken to prevent rain from falling on the prepared sof l surface. <br /> Constructiou RgaEerials&Distributio�af Efttuent <br /> A ciaat� was}�ril sa��d iayet��i�aii br pia�ed where t�►e �ater(rock bedj rnat��riat is tv be tocated. <br /> This sanc� la}�er i�rUst be 3t least �&-inches c�eep and sliazild be d�ep enuugh to level area for <br />
The URL can be used to link to this page
Your browser does not support the video tag.