Laserfiche WebLink
FILE#LA18-000062 <br /> 22 Jan 2019 <br /> Page 3 of 4 <br /> by the Minnehaha Creek Watershed District. <br /> Private, Shared Driveway. The property is proposed to be served via a private driveway <br /> accessing Orono Orchard Road South at the northern point of"Parcel A" and meeting up with <br /> the existing drive. The driveway will be expanded to serve "Parcel B" and an access easement <br /> should be established for each of proposed lots; a maintenance agreement for the private <br /> driveway should also be provided by the developer.A maximum of two lots can be served via a <br /> private driveway. <br /> Park Dedication <br /> The Comprehensive Plan does not suggest the need for new trails or sidewalks along this section <br /> of Orono Orchard Road. There are no plans for future park land needs on the subject property, <br /> staff anticipates park dedication being satisfied via a cash donation. The Park Fee is determined <br /> as 8% of the fair market value of the land being subdivided, but must be between a minimum of <br /> $3,250 and a maximum of$5,550 per residential dwelling unit. For the proposed development, <br /> the Park Fee would be based only on the one newly created lot.The City's Assessor will be <br /> consulted to determine the market value of the land for establishing the amount of the fee. <br /> Stormwater and Drainage Improvements <br /> The developer should coordinate with the MCWD and provide confirmation regarding the <br /> permits or approvals they will require for this subdivision. According to the Anderson <br /> Engineering report, conservation easements will protect the wetland buffer areas as required by <br /> the MCWD.Additionally, according to the report,there were to be two stormwater infiltration <br /> basins installed, following MCWD approval of a stormwater plan,the grading plan should be <br /> updated to reflect any necessary stormwater pond areas. Placement and sizing will be <br /> determined by the Minnehaha Creek Watershed District Rules. <br /> The development is subject to the 2019 Stormwater and Drainage Trunk Fee of$8,060.00 per <br /> lot in a 2 acre zone.Therefore$8,060 x 2 lots=$16,120.00. <br /> Utility Locations and Availability <br /> The subject property is not located within the Metropolitan Urban Service Area (MUSA). <br /> Therefore City sewer is not available to the property.They have provided septic system designs <br /> for each of the lots which appear to be acceptable.The plans will be reviewed more closely at <br /> permitting by the Building Official for conformance with the regulations. <br /> Planning Staff Recommendation <br /> Staff recommends approval in accordance with the forthcoming recommendations of the City <br /> Engineer as well as the requirements of the MCWD.The Planning Commission's options for <br /> action on the proposed plat are: <br /> • Recommend approval of the plat as presented,with appropriate conditions; <br /> • Recommend denial,stating reasons; or <br /> • Table the application providing direction and guidance to the developer. <br /> List of Exhibits <br /> Exhibit A. Preliminary Plat Drawing 12/07/18 <br /> Exhibit B. Proposed preliminary grading plan 12/07/18 <br />