My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info-including '99 design
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
2135 Sixth Ave N - 27-118-23-31-0005
>
Septic
>
septic info-including '99 design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:19:37 PM
Creation date
1/17/2019 3:18:08 PM
Metadata
Fields
Template:
x Address Old
House Number
2135
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
2135 6th Avenue North
Document Type
Septic
PIN
2711823310005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> :r <br /> �'n <br /> Flow per Perforation = .74 gpmJperf <br /> 39.96 gpm = 54 x .l9 qpm/perf `' <br /> 8. If the Header Pipe is connectec� to the end of the Pressure <br /> Distribution System then the calculated L•ateral Diameter is <br /> 2 inches <br /> 9. If the Header Pipe is connected to the Middle of the Pressure <br /> Distribution System then the calculated Lateral Diameter is <br /> 1.5 inches <br /> A. Pressure Distribution <br /> 1. Selected Number of Perforated Laterals: 3 <br /> 2. Perforation Spacing Set at 3 feet <br /> 3. Lateral Length is to be Centered 1 Foot from Each end of the Rock Bed <br /> 54 feet - 2 feet = 52 feet <br /> 4. Calculate Number of Spaces between Perforations <br /> Length (3) divided by Spacing (2) = Number of Spaces (4) <br /> 54 divided by 3 = 17 �paces <br /> 5. Actual Perforations is equal to Calculz�ted (4) pluw 1 <br /> 18 Perforations per Lateral = 1"I + 1 <br /> 6. Total Perforations = Perforatioris/Lateral (P5) times # ot Laterals (P1) <br /> 54 = 18 x 3 <br /> 7. Flow Rate (gpm) = Numbc�r of Perfo�at.ior.s times Flow per Perforation <br /> Flow per Per.foration = .79 gpm/perf <br /> 39.96 gpm = 54 .. .?4 gpr.:!perf <br /> MINIMUM Selected Fump Cap«city: 39. 9G gpm <br /> B. Head Requirements <br /> 1. Elevatiot� difference between pump and point of discharge <br /> 9 feet. <br /> 2. If pumping to a pressure distribution system then ADD 5 FEET <br /> If pumping to a gravity system then ADD Q FEET <br /> 5 feet <br /> 3. Friction Loss <br /> a. Friction Loss in per 1p0 feet of pipe <br /> 3.28 ft per 100 ft of ripe <br /> b. Total Pipe Lengt.h: 230 ft <br /> Equivalent Pipe Length: �87.5 ft <br /> c. Calculated Friction Loss <br /> 9 ft = 3.28 ft x 287.5 ft / 100 <br /> 9 . Totai Head = Cs'zange in r,iEvat�.on t S�eciai itiead Req. + rriction Loss <br />
The URL can be used to link to this page
Your browser does not support the video tag.