My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-P10079 - new septic
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
1805 Sixth Ave N - 27-118-23-41-0002/4
>
Septic
>
2006-P10079 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:21:35 PM
Creation date
1/16/2019 11:17:42 AM
Metadata
Fields
Template:
x Address Old
House Number
1805
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
1805 6th Avenue North
Document Type
Septic
PIN
2711823410002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� 8. Balance flows for other lengths,spacing,or size <br /> , Line 2 GPM= length of pipe x gallons per minute per foot(7) <br /> 111 ft x 0.20 gpm/ft = 21.8 gpm <br /> #of Perfs=GPM /flow rate(5.2) <br /> 21.8 gpm / 0.69 gpm = 31 #of Perfs(Check figure E-4) <br /> Spacing=(Length-2 feet)!(Number of perfs-1) <br /> ( 111 ft-2ft)/( 31 perfs- 1) = 3.6 feet <br /> Line 3 GPM=length of pipe x gallons per minute per foot(7) � <br /> 0.0 ft x 0.20 gpm/ft = 0.0 <br /> #of Perfs=GPM /flow rate(5.2) <br /> 0.00 gpm / 0.00 gpm = 0 #of Perfs (Check figure E-4) <br /> Spacing=(Length-2 feet)/(Number of perfs-1) <br /> ( 0.0 ft-2ft)/( 0 perfs- 1) = 0.0 feet <br /> Line 4 GPM= length of pipe x gallons per minute per foot(7) <br /> 0 ft x 0.20 gpm/ft = 0.0 <br /> #of Perfs=GPM /flow rate(5.2) <br /> 0 gpm / 0.00 gpm = 0 #of Perfs(Check figuns E-4) <br /> Spacing=(Length-2 feet)/(Number of perfs-1) <br /> ( 0 ft-2ft)/( 0 perfs- 1)= 0.0 feet E-20 Volume of Li uid in Pipe <br /> Pipe Diameter Liquid per foot <br /> Line 5 GPM= length of pipe x gallons per minute per foot(7) inches allons <br /> 0 ft x 0.20 gpm/ft = 0.0 1 0.045 <br /> #of Perfs=GPM /flow rate(5.2) 1.25 0.078 <br /> 0 gpm / 0.00 gpm= 0 #of PerFs 1.5 0.11 <br /> Spacing=(Length-2 feet)/(Number of perfs-1) 2 0.17 <br /> ( 0 ft-2ft)/( 0 perfs- 1) = 0.0 feet 2.5 0.25 <br /> 3 0.38 <br /> 9. Calculate tatal gpm 8 Calculate System loading 4 0.66 <br /> Pi volume (see figune E-20) x length <br /> Line 1 Flow= 21.8 gpm 0.11 gal/ft x 111 ft = 12.2 gal <br /> Line 2 Flow= 21.8 gpm 0.11 gal/ft x 111 ft = 12.2 gal <br /> Line 3 Flow= 0.0 gpm gal/ft x 0 ft = 0.0 gal <br /> Line 4 Flow= 0.0 gpm gal/ft x 0 ft = 0.0 gal <br /> Line 5 Flow= 0.0 gpm gal/ft x 0 ft = 0.0 gal <br /> Total= 43.7 gpm Tota1= 24.4 gal <br /> 10. Summary <br /> Pi Size Perf Size Spacing <br /> Line 1 1.5 in 3/16 in 3.0 ft <br /> Line 2 1.5 in 3/16 in 3.6 ft <br /> Line 3 in 0.00 in 0.0 ft <br /> Line 4 in 0.00 in 0.0 ft <br /> Line 5 in 0.00 in 0.0 ft <br /> I hereby cefify that I have completed this work in acxordance with all applicable ordinances,Nles and laws <br /> (signature) 810 (license#) 3/08/2006(date) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.