Laserfiche WebLink
A , <br /> Hennepin County Orono Maintenance Facility Expansion <br /> Plumbing <br /> Plan No. PLB 1412-00075 <br /> Page 3 <br /> December 19, 2014 <br /> 12. Verify that the two-way cleanout referenced on Sheet M1.1 serving the flammable waste line is a single <br /> manufactured piece of equipment and not two separate cleanouts. No fitting,connection,or device which <br /> obstructs or retards the flow of water or sewage in an amount greater than the normal frictional resistance to <br /> show shall be used(see Minnesota Rules,part 4715.2420, subpart 3). <br /> 13. Each horizontal drain branch, including floor drain branches,shall be provided with a cleanout at its upper <br /> terminal with the following exceptions(see Minnesota Rules,part 4715.1000): <br /> a. A readily removable fixture trap or a fixture with an integral trap may be accepted as a cleanout. <br /> b. A floor drain cleanout may be omitted if the floor drain branch line is less than 5 feet. <br /> c. Shower drain,mop sink,and receptor cleanouts may be on the fixture vent,or on the fixture. <br /> 14. A cleanout shall be provided on a common vertical fixture drain or common vent serving two fixture traps <br /> that connect to a vertical drain at the same level. The cleanout shall be the same nominal pipe size as the <br /> drain serving the fixtures. Where the vertical fixture drain is accessible through the trap opening,the <br /> cleanout may be eliminated(see Minnesota Rules,part 4715.1000). <br /> I5. Above-grade horizontal plumbing piping must be supported as follows(see Minnesota Rules, <br /> part 4715.1430, subpart 4): <br /> a. Plastic pipe: at least every 32 inches. <br /> b. Cast iron: at least every 5 feet; or 10 feet when ten foot lengths of pipe are used. <br /> c. Copper tubing(P/a-inch or less): at least every 6 feet. <br /> d. Copper tubing(1'/z-inch or over): at least every 10 feet. <br /> 16. A full-way valve must be provided on the cold water supply line to the water heater(see Minnesota Rules, <br /> part 4715.1800). <br /> NOTE(S): <br /> 1. The scope of this project consists of the remodeling of an existing building. The plumbing installation shall <br /> include five roof drains and storm water drainage piping,water heaters,hose bibbs,pressure washers,a <br /> flammable waste interceptor,trench drains, floor drains,an emergency eyewash, an electric water cooler,a <br /> single compartment sink, two showers,and two public restrooms with flush valve water closets. <br /> 2. This facility will be served by an existing sanitary sewer and a new municipal water service. <br /> Authorization for construction in accordance with the approved plans may be withdrawn if construction is not <br /> undertaken within a period of two years. The fact that the plans have been approved does not necessarily mean that <br /> recommendations or requirements for change will not be made at some later time when changed conditions, <br /> additional information,or advanced knowledge make improvements necessary. <br />