My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00376 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3880 Shoreline Drive - 17-117-23-33-0151
>
Permits/Inspections
>
2015-00376 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:37:05 PM
Creation date
1/2/2019 11:45:16 AM
Metadata
Fields
Template:
x Address Old
House Number
3880
Street Name
Shoreline
Street Type
Drive
Address
3880 Shoreline Drive
Document Type
Permits/Inspections
PIN
1711723330151
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, . . <br /> Erosion Control Suaplemental Information <br /> Fina1 Stabilization wi[I be provided with(seed,sod, etc): $eed and sod <br /> and 6 inches of topsoil will be added/replaced prior to final stabiliza.tion. <br /> Concrete Washout: Location of concrete washout <br /> X Off site _Indicated on site plans �Other(description): _No concrete washout: <br /> Vegetation:Protective fencing will be installed as necessary so as to exclude all fill and ec�uipment <br /> from the drip line or critical root zone,whichever is greater,of all vegetation to be retained. <br /> _Yes X Not Applicable Other(description): <br /> Inspections: An erosion control inspection plan is required for all projects disturbing'/<acre or <br /> greater.The inspection requirements are as follows: <br /> 1) The tndividual identifted as being responsible for rmplemeniing the erosion control <br /> plan must routinely inspect the cortsbuction site once every seven days during acrive <br /> construction and wifhirr 24 hours after a rainfall event greater than 0.S fnches lrr 24 <br /> hours. <br /> 2) ,411 inspections and maintenance conducted during constructian�ust be recorded in <br /> writing and these records must be retained with the erosion contro!plan and made <br /> availabTe at the District's request within 24 hours.ltecords of each it�spection and <br /> mairrtenance activity shall include: <br /> i. Date arrd rime of inspections; <br /> ii. Name ofpersore conducting inspections; <br /> iii. Findings of inspections, including recommendations for conectJve actions; <br /> iv. Correciive actions taken(including dates, times and party completing <br /> maintenance activities);and <br /> v. Date and amount of all rainfall events grealer than 0.5 inches in 24 hours. <br /> Provide the following information for the primary individual responsible for implementing the erosion <br /> control plan: <br /> Name �'�M�� <br /> Organization ��P'Pn" ��''�"1 , <br /> Phone �«- �� 1�30 AlternatePhone �!2 ��Qg �gZ{,p <br /> Email °.����`'1•"^�o'a"�t e henh�p�� . t.sS <br /> I certify that I am familiar with the requirements of the MCWD Erosion Control Rale and thaE the <br /> proposed activity will be conducted in compliance with th�s rnle. <br /> �Ywoa�--. !z•�i• t�i- <br /> Signature of Applicant or Authorized Agent Date <br /> _� _� : � <br />
The URL can be used to link to this page
Your browser does not support the video tag.