Laserfiche WebLink
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> Monday, September 15,2014 <br /> 6:30 o'clock p.m. <br /> 2. Identify how property owners will be notified of the use and preservation of the conservation <br /> areas. <br /> 3. Identify how property owners will develop the septic system locations compatibility with the <br /> goals of the conservation easement areas. In addition, identify septic system maintenance issues <br /> on Lot 13,Block 3. Grittman noted a homeowners association would be in place for this <br /> development. Approximately one-third of the septic sites are located within the Conservation <br /> Easement and Staff is currently reviewing that situation. <br /> 4. Identify,with more specificity,the tree removals required subsequent to street construction and <br /> grading and for house/pad/driveway construction. The applicants have provided a grading plan <br /> depicting the road cuts as well as an extensive tree survey. Grittman noted one of the things that <br /> has not been included on the plan is identification of the driveway locations and what grading will <br /> be necessary for the house pads. <br /> 5. Specify details of retaining wall location and construction. <br /> 6. Identify the impacts of driveway construction, including reasonable gradients and impacts on tree <br /> removals. Grittman noted this is a repeat item. <br /> 7. Resolution of the park dedication issue for plat purposes. Grittman noted the applicant has been <br /> in discussions with the neighbors over the potential dedication of one lot for a park. Staff is <br /> in the process of reviewing the implications a park would have to the City as it relates to <br /> future maintenance and park dedication issues as part of this application. <br /> 8. Proposed use and potential replatting options for Outlot C. Grittman stated in the very southwest <br /> Corner there is an outlot that is approximately two acres in size and that Staff is looking at the <br /> potential for replatting and use of that parcel. <br /> 9. Recommendations of the City Engineer related to stormwater management,utility services, sewer <br /> and water provision, streets and traffic, and other comments as detailed in his report dated <br /> September 12,2014. <br /> Page 45 of 59 <br />