My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
project manual-salt storage bldg-2002
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3880 Shoreline Drive - 17-117-23-33-0151
>
Misc
>
project manual-salt storage bldg-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:37:07 PM
Creation date
12/18/2018 2:17:38 PM
Metadata
Fields
Template:
x Address Old
House Number
3880
Street Name
Shoreline
Street Type
Drive
Address
3880 Shoreline Drive
Document Type
Misc
PIN
1711723330151
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> Hennepin County Special Requirements Section 00800 - SUPPLEMENARY CONDITIONS <br /> ' 1/2/02 Edition <br /> Page 4 of 3Z <br /> , Delete Paragraph 3.9 and substitute the following: <br /> 3.9 PROJECT MANAGERAND SUPERINTENDENT <br /> ' 3.9.1 The Contractor shall employ a competent Project Manager who shall administer the <br /> Agreemerrt Between Owner and Contractor and who shall represent the Contractor. <br /> , Communications given to the Project Manager shall lx as binding as if given to the <br /> Contractor. Important communications shall be confirmed in writing. Other <br /> communications shall be similarly confirmed on written request in each case. <br /> , 3.9.2 The Contractor shall employ a competent superintendent and necessary assistants who shall be <br /> in attendance at the Project site during performance of the Work. The superintendent shall <br /> ' represent the Contractor,and commumcations given to the superintendent shall be as binding <br /> as if given to the Contractor. Important communications shall be confirmed in writing. Other <br /> communications shall be similady confirmed on written request in each case. <br /> ' 3.9.3 The Project Manager and the Superintendent shall be assigned to the Project throughout the <br /> term of the Contract except or unless the designa.ted individual's service to the Contractor is <br /> , terminated or the Owner finds reasonable objection to the individual in which case another <br /> individual shall be assigned to the same responsibility for the remaining term of the <br /> Contract. <br /> I3.10 CONTRACTOR'S CONSTRUCTION SCHEDULES <br /> , Add the following to Subparagraph 3.10.1: <br /> The contractor is requested to provide a Critical Path Method Construction Schedule. <br /> ' 3.11 DOCUMENTS AND SAMPLES AT THE SITE <br /> � Add the following to Paragraph 3.11: <br /> 3.11.2 The Architect will furnish one complete set of Drawings and Project Manual to the <br /> ' Contractor for the purposes of recording all changes in the Work. The Contractor sha11 <br /> preserve and maintain these documents at the site in good condition and shall promptly and <br /> , directly record all changes to the Work upon them. <br /> 3.11.3 The Architect shall mspect these Record Documents from time to time during the course of <br /> � the Work to ascertain their condition and that they reflect the current condition of the Work. <br /> 3.11.4 Upon Substantial Complerion of the Work and prior to Final Payment, the Contractor shall <br /> � return the Record Documents to the Architect for the Arclutect's translation of all changes in <br /> the Work in the Record Documents for delivery to the Owner. <br /> � Suppl Conds-4 <br /> ���C��TY Orono �lt toraee <br /> March 22,2002 Project No.: 0031569 Contract No.: 0751 R2 <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.