My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
project manual-salt storage bldg-2002
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3880 Shoreline Drive - 17-117-23-33-0151
>
Misc
>
project manual-salt storage bldg-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:37:07 PM
Creation date
12/18/2018 2:17:38 PM
Metadata
Fields
Template:
x Address Old
House Number
3880
Street Name
Shoreline
Street Type
Drive
Address
3880 Shoreline Drive
Document Type
Misc
PIN
1711723330151
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> Hennepin County Special Requirements Section 00800 - SUPPLEMENARY CONDITIONS <br /> 1/2/02 Edition , <br /> Page I of 32 <br /> , <br /> SECTION 00800 , <br /> SUPPLEMENTARY CONDITIONS <br /> , <br /> The following conditions may change,delete from or add to the "General Conditions of the Contract for <br /> Construction", AIA Document A201, 1987 Edition, and shall take precedence over the General , <br /> Conditions. Where any article of the General Conditions is modified or any paragraph, subparagraph or <br /> clause thereof is modified or deleted by these Supplementary Conditions, the unaltered provisions of <br /> that article,paragraph,subparagraph or clause shall remain in effect. ' <br /> 1.1 BASIC DEFINITIONS <br /> Add the followin to the list of documents com risin the Contract Documents in the first sentence of ' <br /> g p g <br /> Subparagraph 1.1.1: <br /> Biddin Re uirements Advertisement or Invitation to Bid Instructions to Bidders and ' <br /> g 9 � )� <br /> Supplementary Instructions to Bidders, the Contracto�'s Bid, and portions of Addenda <br /> relating to the bidding requirements. � <br /> Delete the third sentence of Subparagraph 1.1.1. , <br /> 1.2 EXECUTION,CORRELATION AND INTENT <br /> Add the following subparagraph: � <br /> 1.2.6 Where a reference in the Contract Documents to a Federal Specification, American National , <br /> Standards Institute standard, American Society of Testing Materials standard or other <br /> standard does not include the edition or date of the standard, the edition and amendments <br /> current as of the date of this Project Manual shall apply. � <br /> 2.2 INFORMATION AND SERVICES REQUIREDOF THE OWNER <br /> Delete Subparagraph 2.2.1. ' <br /> Change Subparagraph 2.2.5 to read as follows: ' <br /> 2.2.5 The Contractor will be furnished,free of charge,l0(ten) copies of the Drawings and Project <br /> Manuals for execution of the Work. , <br /> Suppl Conds-1 ' <br /> HETRJEPINCOIJIVTY Orono Salt Storaee <br /> March 22,2002 Project No.: 0031569 Contract No.: 0751R2 <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.