My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
project manual-salt storage bldg-2002
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3880 Shoreline Drive - 17-117-23-33-0151
>
Misc
>
project manual-salt storage bldg-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:37:07 PM
Creation date
12/18/2018 2:17:38 PM
Metadata
Fields
Template:
x Address Old
House Number
3880
Street Name
Shoreline
Street Type
Drive
Address
3880 Shoreline Drive
Document Type
Misc
PIN
1711723330151
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� +. <br /> APPENDIX S <br /> , Page 5 <br /> � GOOD-FAITH EFFORTS GUIDELINES <br /> CONTRACT PERFORMANCE <br /> ' <br /> � Information referenced below shall be submitted to the county_ as hereinabove required to assist the county in <br /> evaluating good-faith efforts. Verification of good-faith shall include a specific response to each of the following <br /> applicable categories. The CONTRACTOR may include any additional information the CONTR�CTOR believes <br /> may be relevant. <br /> ' 1. Verification that the contractor entered into a contract with the SBE firm(s) identified on TCS <br /> Form SBE6 to perform work on the projec� <br /> � 2. Verification that,consistent with industry standards,the contractor maintained communication with <br /> the SBE to insure that the SBE understood when to begin work and was available to fulfill its <br /> � contractual agreement. <br /> 3. Statement giving the reason(s) why the subcontractor/supplier contracted with to meet the SBE <br /> � utilization goal did not fulfill its contractual agreemen� <br /> 4. Verification of efforts to replace a non-perfornring SBE by written or telephone notice to all <br /> appropriate SBE's within required subcontracting categories listed in the most current, approved <br /> � certification directory. <br /> � <br /> � <br /> � <br /> M <br /> � . <br /> � . <br /> � � <br /> � � <br /> � SBE Program Revised by TCS 9/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.