My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
project manual-salt storage bldg-2002
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3880 Shoreline Drive - 17-117-23-33-0151
>
Misc
>
project manual-salt storage bldg-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:37:07 PM
Creation date
12/18/2018 2:17:38 PM
Metadata
Fields
Template:
x Address Old
House Number
3880
Street Name
Shoreline
Street Type
Drive
Address
3880 Shoreline Drive
Document Type
Misc
PIN
1711723330151
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> ' ; , <br /> APPENDIX S ' <br /> ;Page 2 <br /> ,, <br /> jSole-Sonrce or Uniqne Goods,Commodities,ar Services <br /> i This exceprion applies to requests for bids/proposals in which the scope is necessarily written such that there is only ' <br /> one source,regardless of the marketplace that possesses the capability to perform the contrack <br /> $elf-Performance ' <br /> This exception applies to prime contractars who self-perform more work than the stated goal allows. For example, <br /> at 100%, the goal is waived, at less than 100%, the goal could be reduced to reflect the actual opportunity for <br /> subcontracting. � , <br /> Other Special Circumstances <br /> Wauld be evaluated on a case-by-case basis at the time good-faith efforts are reviewed. , <br /> ��OOD-F�iTH E�ORTS—BID/PROPOSAL/CONTRACT EVALUATION PROCESS <br /> i ,If CONTRACTOR does not attain the afonsaid SBE goal on TCS Form SBE6,CONTRACTOR must successfully <br /> demonstrate good-faith efforts in accordance with the"Good-Faith Efforts Guidelines—Evaluation Process"doc�ment <br /> conta�ined in Appendix S. CONTRACTOR must submit TCS Form SBE6,SBE7(if applicable),and good-faith efforts <br /> documentation to the Hennepin County Project Manager or county authorized designee for the project/purchase by die close of , <br /> the next business day or other specified time as detcrmined by the county following CONTR.ACTOR'S receipt of the <br /> COUNTY'S notice of apparent low bidder or other notice of iatent to negotiate.Determination of good-faith efforts shall be <br /> deemed satisfactory u�on the approval thereof by the Division Manager. <br /> If CONTRAGTOR,within the aforemerttioned time period,fails to submit to the County Project Manager or county ' <br /> ` authorized designee completed signed TCS Form(s)SBE6,and SBE7(if applicable),which confirms the SBE <br /> utilization level,and fails to successfully demonstrate good-faith efforts,as aforesaid,when TCS Form SBE6 ' <br /> indicates the SBE goal has not been met,CONTRACTOR may have its bid rejected/contract not approved.� <br /> � �PPEAi DURING BID ROPOSAL/CONTRACT EVALUATION PROCESS ' <br /> ' If the Manager determines that CONIRAGTOR has failed to meet the SBE utilization goal n�d has failed to <br /> successfully demonstrate good-faith efforts to meet the goal during the bid/proposaUcontract evaluation process,the ' <br /> ; Manager will notify CONTRAGTQR in writing of the COUNTY'S decision within five (5)business days of such <br /> determination. CONTRACTOR aiay appeal the Manager's decision that CONTRACTOR failed to meet the SBE <br /> � utilization goal and successfi�lly demonsh�ate gooci faith efforts to meet the goal. , <br /> � CONfRACTOR may,within five(5)business days a1�er receipt of the above—referenced written notice,appe�al the <br /> � decision to the County Administrator or designee. An appeal must be made in writing and shall be accompanied by <br /> any supporting documentation. If CONTRACTOR fails to submit an appeal within the aforesaid time period, the � <br /> 'Manager's determination shall remain in e$'ect. The COUNTY may, at its opdon, enter into a contract with the <br /> ' next lowest bidder,or other vendor meeting contract specifications or pursue such othez measures as the COUNTY <br /> deems to be in its best interes� , <br /> C'�OD F�iTH EFFORTS-CONTTZACT PERFOIZMANCE <br /> CONTRACTOR agrees that it must maintain the aforesaid SBE utilization level throughout the conhact term, ' <br /> extension and renewals of this contract If CONTRACI'OR fails to maintain the SBE utilization goal during the <br /> performance of the coniract,and caanot demonstrate good-faith efforts, in ac�ordance with the"Good-Faith Efforts , <br /> Guideiines—Contract Performance"document cantained in Appendix S,to mcet said goal, CONTRACTOR may, <br /> at the COiJNTY'S sole option,be deemed in breach of contract and subject to satictions. <br /> � ', <br /> � <br /> ' SBE Program Revised by TCS 9/00 � <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.