My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
project manual-salt storage bldg-2002
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3880 Shoreline Drive - 17-117-23-33-0151
>
Misc
>
project manual-salt storage bldg-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:37:07 PM
Creation date
12/18/2018 2:17:38 PM
Metadata
Fields
Template:
x Address Old
House Number
3880
Street Name
Shoreline
Street Type
Drive
Address
3880 Shoreline Drive
Document Type
Misc
PIN
1711723330151
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 09 Section 09900 - Painting , <br /> , <br /> SECTION 09900 � <br /> PAINTING <br /> PART 1. GENERAL � <br /> 1.01 CONDITIONS OF THE CONTRACT <br /> A. The Conditions of the Contract (General, Supplementary, and Other Conditions, and � <br /> the General Requirements(Sections of Division 1)apply to the work of this section. <br /> 1.02 SUMMARY , <br /> A.This section includes the furnishing and installation of the water repellents products � <br /> specified in Section 07180. <br /> B. Related sections: <br /> 1. Division 3 Section-"Architectural Precast Concrete." ' <br /> 2. Division 7 Section- "Water Repellents." <br /> C. This section includes surface preparation and field painting of exposed exterior and , <br /> interior items and surfaces. <br /> 1.03 SUBMITTALS , <br /> A. For each paint system specified,provide the following: <br /> 1. Material List: Provide an inclusive list of required coating materials. Indicate , <br /> each material and cross-reference specific coating, finish system, and <br /> application. Identify each material by manufacturer's catalog number and � <br /> general classification. <br /> 2. Manufacturer's Information: Provide manufacturer's technical information, <br /> including label analysis and instructions for handling, storing, and applying <br /> each coating material proposed for use. , <br /> 1.04 BENCHMARK SAMPLES(MOCKUPS) <br /> A. Provide a full-coat benchmazk finish sample of each type of coating, and substrate ,' <br /> required on the Project.Comply with procedures specified in PDCAP5. <br /> 1. The Architect will select one surface to represent surfaces and conditions for ' <br /> each type of coating and substrate to be painted.After permanent lighting and <br /> other environmental services have been activated, apply coatings in this room <br /> or to each surface as specified. � <br /> a. After finishes are accepted,the Architect will use the room or <br /> surface to evaluate coating systems of a similaz nature. � <br /> B. Deliver materials to the Project Site in manufacturers original,unopened packages and <br /> containers bearing manufacturer's name and label. <br /> 09900- 1 ' <br /> HENNEPIN COIIIVTY Orono Salt Storage <br /> March 22,2002 Project No.:0031569 Contract No.:0751 R2 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.