My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
project manual-salt storage bldg-2002
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3880 Shoreline Drive - 17-117-23-33-0151
>
Misc
>
project manual-salt storage bldg-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:37:07 PM
Creation date
12/18/2018 2:17:38 PM
Metadata
Fields
Template:
x Address Old
House Number
3880
Street Name
Shoreline
Street Type
Drive
Address
3880 Shoreline Drive
Document Type
Misc
PIN
1711723330151
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> DIVISION O1 CONTRACTCLOSEOUT-Section 1700 <br /> 4. Contractor's Summary of Payments. , <br /> 5. Consettt of Surety to Final Payment on Consent of Surety Company to Final Payment, AIA , <br /> Document G707, April 1970 Edition. <br /> 6. State of Minnesota - Department of Revenue Form IC-134, rev. 9/89, "Withholding Affidavit � <br /> for Contractors", prepared by the Contractor and all Subcontractors and certified by the <br /> Commissioner of Revenue. <br /> 7. Current list of subcontractors and major material suppliers indicating type of work or product, ' <br /> brand name and/or manufacturer's name and model number in the sequential sectional order of the <br /> Project Manual, including fum name, address,telephone and contact person. <br /> 8. Contractor's Record Copy of all Drawings, Specifications, Change Otders and other ' <br /> modifications, including construction photographs, in good order, and marked to record all <br /> changes made during construction, and approved Shop Drawings,Product Data and Samples. ' <br /> 9. All payroll reports, certifications and related documents necessary to fulfill the Labor Standards <br /> Provisions requirements of the contract. An affidavit stating that payrolls bills for materials and <br /> equipment and other indebtedness connected with the Work for which the Owner might become ' <br /> responsible, have been paid and satisfied. <br /> 10. All written wananties required by the Contract Documents. , <br /> 1 l. All operation manuals, instrucrions, test reports and other data required by the Contract <br /> Documents. <br /> Final payment will not be made to the Contractor until the aforementioned requirements have been turned over ' <br /> to the Architect, the Architect has prepared final Record Documentsonpolyester film or CADD diskettes, and <br /> are received and approved by the Owner. ' <br /> If necessary,reinspection procedure will be repeated at cost to the Contractor. <br /> PART 2 PRODUCTS ' <br /> Not Used , <br /> PART 3 EXECUTION ' <br /> Not Used <br /> END OF SECITON- 1700 � <br /> ' <br /> , <br /> 1700-4 ' <br /> HENNEPINCOUNTY Orono Salt Stora� <br /> March 22,2002 Project No.: 0031569 Contract No.: 0751R2 <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.