My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
project manual-salt storage bldg-2002
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3880 Shoreline Drive - 17-117-23-33-0151
>
Misc
>
project manual-salt storage bldg-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:37:07 PM
Creation date
12/18/2018 2:17:38 PM
Metadata
Fields
Template:
x Address Old
House Number
3880
Street Name
Shoreline
Street Type
Drive
Address
3880 Shoreline Drive
Document Type
Misc
PIN
1711723330151
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> DIVISION O1 CONTRACTCLOSEOUT-Section 1700 <br /> ' <br /> SECTION 017� <br /> � CONTRACT CLOSEOUT <br /> ' PART1 GENERAL <br /> 1A1 CONDITIONS OF THE CONTRACT <br /> ' A. The Conditions of the Conttact(General, Supplementary, and Other Conditions)and the General <br /> Requirements(Sections of Division 1), apply to the work of this section <br /> ' 1.02 REQUIREMENTS INCLUDED <br /> A. Closeout Procedures. <br /> ' B. Final Cleaning. <br /> C. Project Record Documents. <br /> ' D. Operation and Maintenance Data. <br /> E. Warranties and Bonds. <br /> ' F. Spaze Parts and Maintenance Materials. <br /> 1.03 RELATED REQUIREMENTS <br /> , A.General Conditions:Fiscal provisions,legal submittals, and other administrative requirements. <br /> ' B. Section 01010=Summary of Work: Owner Occupancy. <br /> C. Section 01500 ConstructionFacilities andTemporary Controls:Cleaning duringconstruction <br /> , 1.04 CLOSEOUT PROCEDURES <br /> A. Comply with procedures stated in General Conditions of the Contract for issuance of Certificate of <br /> ' Substantial Completion. <br /> B. Complete equipment identification, valve tagging, pipe marking and similaz work;refer to mechanical <br /> and electrical sections of these specifications. Operate and test the performance of operating <br /> , equipment and systems. <br /> C. Owner will occupy Project for the purpose of conductingbusiness. <br /> � D. When Contractor considers Work has reached final completion, submit written certification that <br /> Contract Documents have been reviewed, Work has been inspected, and that Work is complete in <br /> accordance with Contract Documents and ready for Architect/Engineer's observation. Submit <br /> ' Contractor's Notice that the Work, including completed or corrected punch-list items. <br /> E. In addition to submittals required by the conditions of the Contract, provide submittals required by <br /> governing authorities, and submit a final statement of accounting giving total adjusted Contract Sum, <br /> � previous payments,and sumremaining due,include supporting documentation not previously submitted <br /> and accepted. Include certificates for products and completed operations. <br /> ' 1700-1 <br /> ��C�'� Orono Salt�tnrn� <br /> March 22,2002 Project No.: 0031569 Contract No.: 0'751R2 <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.