Laserfiche WebLink
� <br /> DIVISION O1 QUALIT'YCONTROL-Section 01400 <br /> ' <br /> SECTION 01400 , <br /> QUALITY CONTROL <br /> , <br /> PART1 GENERAL <br /> 1.01 CONDITIONS OF THE CONTRACT , <br /> A. The Condirions of the Contract (General, Supplementary, and Other Conditions) and the <br /> General Requirements (Sections of Division 1), apply to the work of this section <br /> 1.02 REQUIREMENTSINCLUDED � <br /> A. General Quality Control. � <br /> B. Workmanship. <br /> C. Manufacturer's Instructions. � <br /> D. Manufacturers' Field Services. <br /> � <br /> 1.03 RELATEDREQiJIItEMENTS <br /> A. Document 00700 - General Conditions: Inspecrion and testing required by governing authorities. , <br /> B. Section 01090 - Reference Standards: Applicability of specified reference standards. � <br /> D. Section [01300 - Submittals: Submittal of Manufacturer's Instrucrions. <br /> 1.04 QUALITY CONTROL,GENERAL � <br /> A. Maintain quality control over suppliers, manufachuers, products, services, site conditions, and <br /> workmanship, to produce work of specified quality. , <br /> 1.05 WORKMANSHIP <br /> A. Comply with industry standards except when more restrictive tolerances or specified � <br /> requirements indicate more rigid standards or more precise workmanship. <br /> B. Perform work by persons qualified to produce workmanship of specified quality. � <br /> C. Secure products in place with positive anchorage devices designed and sized to withstand <br /> stresses, vibration, and racking. ' <br /> 1.06 MANLJFACTURERS'INSTRUCTIONS <br /> A. Comply with instructions in full detail, including each step in sequence. Should instructions ' <br /> conflict with Contract Documents, request clarification from Architect/Engineer before <br /> proceeding- <br /> 01400-1 ' <br /> I�NNEPIN COiJNTY Orono Salt$toraee <br /> March 22,2002 Project No.: 0031569 Contr�t No.: 0751R2 <br /> � <br />