My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
salt storage addendum #1
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3880 Shoreline Drive - 17-117-23-33-0151
>
Misc
>
salt storage addendum #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:37:08 PM
Creation date
12/18/2018 2:00:55 PM
Metadata
Fields
Template:
x Address Old
House Number
3880
Street Name
Shoreline
Street Type
Drive
Address
3880 Shoreline Drive
Document Type
Misc
PIN
1711723330151
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04111/2002 23:24 9529300043 LASZLO FULOP PAGE 11r'21 <br /> APPENDLX S <br /> CONTRACT AINARD <br /> GOOD-�AITH EF�ORTS CtiU1DELINES <br /> Information referenced below-�shall be submitted to the county as required to assist th� county in .- <br /> ev�luating good-faith efforts. Verification of good-faith efforts shall include a specific response to <br /> each of the following applicable categories. A bidder may include any additiona! informativn the <br /> bidder believes may be relevant. <br /> 1. Verification tha#the bidder rejected SeE',s because they did not submit the lowest bid or they <br /> were not quaiifed. Such verification shall include a verified sta#ement of the amounts of all <br /> bids received from potential subcon#ractors on the project and that the bidder rejecEed SBE's <br /> because they did not submit the lowest bid from amortg such bids or they were not qualified. <br /> For each S�E found to be not qual'rfied, the verification shall iriclude a statement giving the <br /> bidder's reasons for its conclusion. <br /> 2. Verification of efforts to contract by timely written or telephone notice to all appropriate SBE's <br /> within identified subcontracting categories listed in the most current, approved certification <br /> Directory. !f bidders have purchased pr�ject plans seven (7) calsndar days ar fewer before <br /> bids are due, dvcumented phone calfs in lieu of written notice may be permitted. <br /> 3. Verification of efForts tQ subcontract, consistent with industry practice, with the SBE's whom <br /> the bidder has contaCted, or who have contacted the bidder. Include the names, addresses, <br /> and telephone numbets of all SBE's contacted; a description ofi efforts made to subcontract; <br /> and a description af the information provided to the SBE regarding the plans and <br /> specifications for the portion of the work to bs perFormed by subcontractors. If attempts to <br /> subcontract actually occurred, provide the dates and places of such process and a <br /> description of the outcome. <br /> 4. Verification that the bidder attempted to recruit S�E's from at Ieast the same geographic area <br /> from which it attempted to recruit other subcontractors. <br /> 5. Verification that, consistent with industry practice, the bidder gave SBE's necessary access <br /> to and adequate time to review all necessary project plans, drawings, specifications and <br /> other documents, as well as adequate time to prepare subconUact bids. <br /> 6. Verification that, consistent with industry practice, th�'�bidder's past practices on similar <br /> projects, the bidder selected portions of the work to be pertarmed by SBE's in order io <br /> achieve the project utilization levels. This Includes considerativn of structuring the contract <br /> into economically feasible units to facilitate meaningful SBE utilization as subcontractors or <br /> suppliers. <br /> 7. Statement giving the reasons why the bidder and each SB� contacted or each SBE that <br /> contacted the bidder did not succeed in reaching a subcontracting agreement. <br /> 8. Statement that the bidder attended pre-bid meetings or otherwise obtained the information <br /> on subcontracting opportuni#ies that is provided at such meetings. <br /> . ... . . .. .. <br /> L. Rev.3/18/02 <br /> p,4 af 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.