My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-25-2010 Council Work Session Packet
Orono
>
City Council
>
2010
>
09-25-2010 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 10:09:50 AM
Creation date
12/13/2018 3:57:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' Clfy of Orono Page 3 <br /> Surface Water Management Plan January 8,2009 <br /> • 2030 Land Use Map(from City) <br /> • Existing Land Use Map(from City, if available) <br /> . County Biological Survey(from pub{ic sources, prepared by Bonestroo) <br /> • Wetland Functions and Values Map�either from previous City work or from new work by MCWD, <br /> formatted by Bonestroo) <br /> • Figure showing the following four subwatersheds(for the purpose of the Phosphorus Reduction <br /> Plan): <br /> o Long Lake Creek upstream of Long Lake <br /> o Long Lake Creek from Long lake to Tanager lake <br /> o Painters Creek <br /> o Lake Minnetonka <br /> • Soils map(from public sources, prepared by Bonestroo) <br /> � • Implementation Priorities Map(prepared by Bonestroo) <br /> • DNR PWI map(from public sources,formatted by Bonestroo) <br /> The Surface Water System Map from Orono's 2002 SWMP will not be modified but will be included in the <br /> updated SWMP. Appendix 5ections A through F will be inserted into the updated SWMP as currently - <br /> formatted and withaut revision ar update. Appendix G will be updated to reflect changes in practices and <br /> Orono's new Gaals and Policies, Appendices H and I will either be integrated into the Wetland <br /> Management Sectian or replaced as appendices by materials prepared by MCWD that are more consistent <br /> with their wetland management program. <br /> Typical agency review comments for a SWMP run one to two pages for smaller tommunities and can <br /> generally be resolved for$9,500 in labar cost. We assume,for the purposes of our fee estimate,that the <br /> watershed comments are of similar scope. <br /> Schedule <br /> Once authorized to proceed,we can have a draft report to City staff in eight weeks. Once staff comments <br /> are received we will then submit the SWMP to Metropolitan Council, Minnehaha Creek Watershed District � <br /> and Hennepin Counry. Minnehaha Creek Watershed District has 60 days to review the plan after which we <br /> re5pand to their comments and obtain their board's approval of Orono's SWMP. Subsequent to this the <br /> Orono tity Council adopts the SWMP and an approved copy is sent to Metropolitan Council, The following <br /> table summarizes aur proposed schedule. <br /> Item Timeframe <br /> Authorization to roceed lanuar 12, 2009 <br /> Cit staff be ins review of draft SWMP March 10, 2009 <br /> Cit staff comments obtained March 31, 2009 <br /> A enc review be ins A ril 8, 2009 <br /> A enc cornments due June 8, 2009 <br /> Revised SWMP and MCWD board approval 1uly, 2009 <br /> Orono Cit Council ado ts SWMP Au ust, 2009 <br /> We will submit the revised Environmental ManagemenUProtection Plan for Orono's Comprehensive Plan by � <br /> February of 2009 so staff can proceed on assembling the comprehensive plan for community review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.