My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-26-2018 Council Work Session Packet
Orono
>
City Council
>
2018
>
11-26-2018 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 3:56:49 PM
Creation date
12/13/2018 9:47:00 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Jeremy Barnhart, Orono <br />November 13, 2018 <br />Page 3 of 9 <br />• Future connection points for new growth if needed. <br />• Local sewer service districts by connection point. <br />• Intercommunity connections. <br />Please include a copy of intercommunity service agreements entered into with an <br />adjoining community, including a map of areas covered by the agreement. <br />o Include a table or tables that provide the following local system information for: <br />• Capacity and design flows for existing trunk sewers and lift stations. <br />o Describe the sources. extent, and significance of existing inflow and infiltration in both <br />the municipal and private sewer systems. <br />• Include a breakdown of residential housing stock age within the community into <br />pre- and post -1970 era and what percentage of pre -1970 era private services <br />have been evaluated for 1/1 susceptibility and repair. <br />• Include the measured or estimated amount of clearwater flow generated from the <br />public municipal and private sewer systems. <br />• For quantifying Ill, some communities have used the EPA guidance to determine <br />the annual Ili and peak month III <br />https://www3.epa.gov/region1/sso/pdfs/Guide4EstimatingInfiltrat onInflow pdf <br />o Describe the implementation plan for preventing and eliminating excessive inflow and <br />infiltration from entering both the municipal and private sewer systems <br />• Include the strategy for implementing projects. activities, or programs planned to <br />mitigate excessive 1/1 from entering the municipal and private sewer systems. <br />■ Include a schedule and the related financial mechanisms planned or needed to <br />implement the III mitigation strategy. <br />Include a map or maps (GIS shape files or equivalent) showing the following information: <br />• Location of sub -surface sewage treatment systems. <br />■ Location of nonconforming systems or systems with problems <br />Forecasts (Todd Graham. 659-602-1322) <br />The Plan is incomplete for citywide employment forcasts. TAZ allocation of forecasts. and <br />employment -bearing land use intensity <br />The Plan includes the Metropolitan Councils households and population forecasts, but does not <br />use Metropolitan Councils employment forecast (table 2.2) The City's reason for using a lower <br />employment forecast is not given. the City could request a lower forecast but has not. For <br />completeness. the final Plan submittal must include the Metropolitan Council's employment <br />forecast. Metropolitan Council's forecasts are: <br />Metropolitan Council Forecast: Orono <br />2020 2030 2040 <br />Population 7437 7691 8100 8800 9500 <br />Households 2826 3037 3200 3560 3900 <br />Employment 1562 1579 1700 1780 1800 <br />
The URL can be used to link to this page
Your browser does not support the video tag.