*The table also included Forest Arms Lane which was designed in 2018 but is recommended for execution in 2019 <br />due to funding shortfalls in 2018. Forest Arms Lane Cost estimates are based on 2018 Bid Amounts. <br />5. East Long Lake Road (Northern Section). Staff is also seeking direction from Council on the long <br />term disposition of East Long Lake Road. This is a separate council action for May 29th, 2018. <br />6. Resident Input. City staff has received a petition from the residents on Casco Circle asking the city <br />to address road issues (Exhibit A). In addition Staff has received numerous appeals from residents on <br />Chevy Chase and Lyman Avenue for maintenance. <br />7. Engineering and Design Cost. Bolton and Menk has provided a scope of services for a fee estimate <br />not to exceed $165,000 (Exhibit B). The estimated construction cost for each project from the CIP is <br />listed in the table below. <br />8. Funding. The engineering as well and the eventual projects will be funded with a combination of the <br />Pavement Management Fund, Utility Funds, and Stormwater Fund. <br />a. Funding Needs Estimates. <br />Fund <br />Cost Estimate <br />Est. 2019 End of Year <br />Fund Balance <br />Pavement Fund <br />$ 1,077,877 <br />$ 120,053 <br />Stormwater Fund <br />$ 142,701 <br />$ 1,366,573 <br />Utility Funds <br />$ 58,874 <br />$ 1,594,158 <br />Total <br />$ 1,279,452 <br />b. Pavement Fund. Adequate resourcing of the Pavement Fund continues to be of concern. See <br />Pavement CIP/Funding Table at Exhibit C. Planning for 2019 and beyond is based on the funding <br />guidance provide at the March 22nd, 2017 Council Work Session. Adequate funding for the 2019 <br />projects is based on several assumptions: one, the pavement levy for 2019 is set at $750K; two, $450K is <br />available for positive fund balances from 2018, and that $100K of water tower lease revenue is <br />dedicated to street maintenance. <br />COUNCIL ACTION REQUESTED: <br />Move to: <br />1. Approve the 2019 Road Maintenance plan <br />2. Acceptance of the Bolton and Menk's proposal for design and engineering services for a fee not <br />to exceed $ 165,000. <br />Exhibits <br />A. Casco Point Petition <br />B. Bolton and Menk Construction Proposal <br />C. Pavement CIP/Funding Table <br />