AGENDA ITEM <br />Item No.: 18 Date: May 29, 2018 <br />Item Description: 2019 Street Maintenance Planning and Engineering <br />Presenter: Adam T. Edwards Agenda Public Works Director/ <br />Public Works Director/City Engineer Section: City Engineer's Report <br />1. Purpose. The purpose of this action item is to gain council approval to commence the planning and <br />engineering of the 2019 Street Maintenance Project. <br />2. Background. At the March 22"d, 2017 Council Work Session the Council provided guidance on a <br />way forward for road maintenance funding for road maintenance projects and funding. That guidance <br />was used to prepare the Capital Improvement Plan (CIP). The CIP was in turn used to prepare this action <br />item. <br />Due to an increase in the required scope and a reduced funding availability in 2018 the Forest Arms <br />Lane project is recommended to be deferred from 2018 to 2019. Engineering and design is already <br />complete for this street and therefore not included in the engineering proposal for 2019. <br />This proposal was presented at the April 23rd Council meeting and tabled to allow council members to <br />drive the selected roads. <br />3. Scope. Planning and engineering will consist of topographic surveying, utility inspections, design, <br />permitting, public input and solicitation of bids for select roads. <br />4. 2019 Recommended Roads. The table below list the streets identified on the Capital Improvement <br />Plan (CIP) for projects in 2019. The first column provides the staffs recommended priority. The second <br />column depicts council guidance from the May 29t' Work Session (to be updated after the work session). <br />Prepared By: Reviewed By: Approved By: <br />Street <br />Type <br />CIP Estimated Cost <br />w ' <br />o <br />Pavement <br />Stormwater <br />Utilities <br />Total <br />d <br />1 <br />Forest Arms <br />Reconstruction <br />Lane * <br />$ 383,856 <br />$ 13,101 <br />$ 34,124 <br />$ 431,081 <br />2 <br />East Long Lake <br />Reconstruction <br />Road (South) <br />$ 166,900 <br />$ 77,000 <br />$ 243,900 <br />3 <br />Windjammer <br />Reconstruction <br />Lane <br />$ 71,834 <br />$ 7,200 <br />$ 24,750 <br />$ 103,784 <br />4 <br />Tonkaview Lane <br />Mill and <br />overlay <br />$ 90,204 <br />$ 9,000 <br />$ 99,204 <br />5 <br />Lyman Avenue <br />Mill and <br />overlay <br />$ 46,321 <br />$ 4,600 <br />$ 50,921 <br />6 <br />Chevy Chase <br />Mill and <br />Drive <br />overlay <br />$ 175,532 <br />$ 17,500 <br />$ 193,032 <br />7 <br />Kenwood Way <br />Mill and <br />overlay <br />$ 22,795 <br />$ 2,300 <br />$ 25,095 <br />8 <br />Casco Circle <br />Mill and <br />overlay <br />$ 120,435 <br />$ 12,000 <br />$ 132,435 <br />2019 prqiects TOTAL <br />$ 694,021 <br />$ 129,600 <br />$ 24,750 <br />$ 848,371 <br />TOTAL With Forest Arms <br />$ 1,077,877 <br />$ 142,701 <br />$ 58,8741 <br />$ 1,279,452 <br />Prepared By: Reviewed By: Approved By: <br />