Laserfiche WebLink
22. Provide all new flashings to all perimeters,projections, control joints and <br /> mechanical equipment in accordance with manufacturer's specifications. <br /> 23. We will insta1175 walk pads for this roofing project. Walk pads will be used for <br /> wood block supports, equipment supports and for walkway azea at mechanical <br /> equipement. <br /> 24. Provide pre-molded accessories where applicable to soil stacks and roof <br /> projections in accordance with manufacturer's specifications. <br /> Sheet Metal <br /> 25. Fabricate and install new galvanized continuous keeper along the face of the <br /> building. Keeper will be mechanically fastened to the building's fa�ade. <br /> 26. Fabricate and install new 24-gauge prefinished metal edge and coping as required. <br /> *Color to be chosen by the owner. <br /> Tear-Down and Closeout <br /> 27. Remove all roofing related equipment from the job site area. This will include all <br /> safety and fall protection equipment, dumpsters,biffy, and roofing materials. <br /> 28. Clean and restore the surrounding site to the original condition,this will include <br /> sweeping any paved surfaces, and removing debris. <br /> 29. Provide complete cleanup of the work premises and provide a final job walk <br /> through and inspection prior to issuance of warranty. <br /> End of Specification# 1 <br />