My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
report of Geotechnical Exploration-1991
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3333 Shoreline Drive- 20-117-23-11-0024
>
Misc
>
report of Geotechnical Exploration-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:47:46 PM
Creation date
11/30/2018 12:40:07 PM
Metadata
Fields
Template:
x Address Old
House Number
3333
Street Name
Shoreline
Street Type
Drive
Address
3333 Shoreline Drive
Document Type
Misc
PIN
2011723110024
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
; Page 8 - #4220 91-1043 <br />�-- Boring Surface Minimum Depth Estimated Elevation <br /> Num6er Elevation (t�Z Of Excavation (t�� Qf Bottom of Excavation (ft2 <br />`- 1 97.7 3.5 94.2 <br /> . 2 85.2 9 76.2 <br /> 3 94.0 A A <br />�--- Note: A - Excavation at the southwest corner of the existing building (near boring <br /> ,- <br /> #3) should extend to approximate elcvation 90' to match existing foundation <br /> elevation. Extending from this corner west and south we expect the <br />�— excavation will extend deeper, at least as deep as elevation 82' to remove <br /> uncontrolled fill overlying the competent natural deposited soils. <br /> Excavation along the west wall of the existing building should be performed in a manner <br />~ to avoid disturbing soils beneath the existing foundation elements. We recommend the <br />� excavation be performed to leave intact soil beyond the limits of the existing building to <br /> provide a 1:1 slope of the excavation downwards from the foundation and provide lateral <br /> support for the foundation soils for the existing construction. Careful �eld observation <br />__ will be required by a geotechnical engineer during this phase of the excavation to aid in <br /> distinguishing between portions of the existing fill which were placed in a controlled <br />� manner from those placed in an uncontrolled manner. Some contingency should be <br />_ provided in project budgeting for excavation that extends beyond the limits indicated by <br /> the borings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.