My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
report of Geotechnical Exploration-1991
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3333 Shoreline Drive- 20-117-23-11-0024
>
Misc
>
report of Geotechnical Exploration-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:47:46 PM
Creation date
11/30/2018 12:40:07 PM
Metadata
Fields
Template:
x Address Old
House Number
3333
Street Name
Shoreline
Street Type
Drive
Address
3333 Shoreline Drive
Document Type
Misc
PIN
2011723110024
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 - #4220 91-1043 , <br />" Actual structural loadings for the construction are not presently available. However, we <br /> do anticipate that wall and column loadings will be relatively light, <br />-� Our design assumptions include an allowable total settlement of up to 1", and a <br /> minimum safety factor of three with respect to shearing or base failure of the new <br /> foundations. <br /> 3.2 Discussion <br />_ We understand the existing structure was constructed in 1976, and is supported on a <br /> normal spread footing foundation system. Elevations of the existing foundations <br /> L apparently range from about 4' below slab grade in the north to about 10' below slab � <br />_ grade in the south. We understand foundations are supported upon a compacted fill <br /> system placed after excavation of compressible soils in 1976. <br />_ The results of soil observation and internuttent compaction testing performed by our firm <br /> during the original construction in 1976 were available for our review. The associated <br />� report (#9-7112) indicates the bottom of�the original excavation ranged from about 7' <br />_ to 19' below floor elevation. A compacted fill consisting primarily of cohesive clays was <br /> placed to re-establish building grade. Project specifications at the time of this <br />� construction required that compacted fill be compacted to a minimum of 95% of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.