My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
site work specs
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3333 Shoreline Drive- 20-117-23-11-0024
>
Misc
>
site work specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:47:46 PM
Creation date
11/30/2018 12:37:57 PM
Metadata
Fields
Template:
x Address Old
House Number
3333
Street Name
Shoreline
Street Type
Drive
Address
3333 Shoreline Drive
Document Type
Misc
PIN
2011723110024
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ' E. Remove all undesirable soils in the building pad and dock area subgrade <br /> to competent soils as determined by the testing laboratory. The <br /> building pad will be the area under floor and footings oversized by five <br /> feet outside the foundation walls and sloped outward and downward at a <br /> one to one slope. Excavation along the existing building wall will be <br /> done in a manner avoiding disturbance of soils beneath the existing <br /> foundations. A testing laboratory representative will be present during <br /> this process to determine competency of soils and establish limits of <br /> required excavation. <br /> 3.03 SITE GRADING <br /> A. Prepare building pad and subgrade for dock area with engineered fill . <br /> The engineered fill will be placed to 10 inches below finished floor and <br /> to the bottoms of all footings with five feet of oversizing outside the <br /> outer wall footings. Compact in .lifts to specified density. , <br /> B. Proof roll surfaces of all rough graded cut and fill areas within <br /> construction limits and surface compact top 12 inches to specified <br /> density. Soft areas shall be excavated and replaced with suitable <br /> material prior to completing surface compaction. <br /> � C. Surfaces of all excavations shall be inspected and approved by the ' ' <br /> testing firm before backfilling is permitted. � <br /> D. Frozen material shall not be used as backfill nor shall backfill be <br /> permitted on frozen ground. No construction shall bear on frozen <br /> ground. <br /> � E. Place fill in loose level lifts not �to exceed eight inches and compact � <br /> to the specified density. �, <br /> F. Rough graded and finished graded areas shall be free draining, such that <br /> no surface runoff will pond. The Contractor shall be responsible for <br /> interim maintenance and remedial soil correction until final surfacing <br /> is commenced. <br /> G. Final rough grade all areas receiving top soil or surfacing, including _ <br /> excavated and filled sections and adjacent transition areas. Finished <br /> surface shall be free of irregularities exceeding 0. 10 feet above or <br /> below adjacent surfaces or finished subgrade elevations. <br /> H. Place top soil on all areas as indicated on plans. Soils which are <br /> unsuitable for engineered fill may be placed in embankment outside of <br /> the pad and subgrade for paving if approved for such use by the testing <br /> laboratory. <br /> I . Place six inches of select granular fill under floor slabs and outside <br /> concrete slabs and compact to specified density. <br /> 3.04 EXCAVATION AND BACKFILL <br /> A. Excavate to elevations and dimensions required for the work. Should <br /> soil be softened by rain prior to pouring footings, remove soft soil <br /> down to dry firm soil , backfill with suitable material and compact to <br /> specified density. <br /> � ^ <br /> � 02200-3 <br /> 191/1/1006. 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.