My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
site work specs
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3333 Shoreline Drive- 20-117-23-11-0024
>
Misc
>
site work specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:47:46 PM
Creation date
11/30/2018 12:37:57 PM
Metadata
Fields
Template:
x Address Old
House Number
3333
Street Name
Shoreline
Street Type
Drive
Address
3333 Shoreline Drive
Document Type
Misc
PIN
2011723110024
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ' PART 2: PRODUCTS <br /> 2.01 MATERIALS <br /> A. Top Soil : Locally available materials which produces heavy growth of <br /> vegetation and is free from noxious weeds, stones, or other deleterious <br /> matter. May be salvaged from site excavations if approved by the <br /> testing firm. <br /> B. Excavated Material : May be used for backfill , provided wood, roots and <br /> other deleterious materials are removed subject to approval by the <br /> independent testing laboratory. <br /> C. Engineered Fill : Clean materials from the site or from off site pits as <br /> approved by representative of testing laboratory. <br /> D. Select Granular Fill : Material passing a 2" sieve size and with not <br /> more than 10% passing the #200 sieve. <br /> PART 3: EXECUTION <br /> 3.01 PROTECTION � � " ' ' <br /> A. Adequate protection measures shall be provided to protect workmen and <br /> passersby. Streets and adjacent property and structures shall be fully <br /> protected throughout the operation. <br /> B. Shoring, sheeting and bracing shall be provided to prevent caving, <br /> erosion or gullying of sides of excavation. <br /> C. Provide for surface drainage during the period of construction in a <br /> manner to avoid creating a nuisance to adjacent areas. Take special <br /> care to prevent surface drainage from filling excavations. <br /> D. Protect from damage during construction, any trees or shrubbery which <br /> are indicated on the drawings to remain. Protect from damage all <br /> exi.sting buildings indicated to remain. <br /> E. Install required erosion control fence and devices before excavating. <br /> 3.02 SITE PREPARATION <br /> A. Remove all shrubs, grasses and other vegetation, improvements or <br /> obstructions within construction limits. <br /> B. Clear and grub all trees designated for removal . Stumps and root <br /> structures shall be completely grubbed. <br /> C. Strip top soil from the construction area, including the building area <br /> . and stock pile suitable material for later use. Remove unsuitable <br /> material from the site. <br /> D. Remove existing bituminous surfacing, concrete dock, and other <br /> structures or materials in the area to be excavated. <br /> ' `� <br /> 02200-2 <br /> 191/1006. 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.