Laserfiche WebLink
insert area activit <br /> Date of maintenance Maintenance conducted Inspector <br /> 8. Non-Stormwater Discharge Certification <br /> It is important that the Permittee eliminate all unauthorized stormwater discharges from the facility.Therefore the Permittee <br /> must assess each discharge location and monitoring location for the presence of non-stormwater discharges and document all <br /> findings. <br /> Date Evaluation Discharge location Non-stormwater source <br /> mm/dd/ rocess/actions taken <br /> N/A <br /> 9. Spill Prevention and Response Procedure <br /> All Permittees are required to have a Spill Prevention and Response Plan. However, if the facility already has a Spill Prevent <br /> Control and Countermeasure Plan as required by federal law,the plan can incorporated into the SWPPP as a separate <br /> document.At a minimum the plan to be included should have:Areas where spills have the potential to occur, discharge <br /> locations and surface waters which would be affected by spills,all spills and quantities,contact information,and BMPS in place <br /> to mitigate spill impacts. <br /> 10. Mercury Minimization Plan <br /> If the Permittee has any mercury sources exposed to stormwater,a Mercury Minimization Plan is required.Within the plan a <br /> description of the sources and mitigation techniques shall be included. <br /> Date of <br /> Exposed to Mitigation completion <br /> Mercu source stortnwater techni ues mm/dd/ <br /> 11. Employee Training Program <br /> For industrial stormwater implementation at your facility to be successful,a program should be developed to train employees <br /> at the facility how to fulfill main requirements of the permit including but not limited to: BMP operation and maintenance, <br /> monitoring,good housekeeping, and material storage and management.The training needs to be done annually. If it is fitting <br /> that training should occur more frequently,this should be noted in the training schedule in the SWPPP.All training documents <br /> must either be attached or included in the SWPPP and include: trainer,trainer's organization, date of training,training topics, <br /> and employees in attendance. <br /> Trainin To ic-Trainer or anization <br /> Date <br /> mm/dd/ Emplo ee Name Si nature <br /> 4/13 All Staff <br /> www.pca.state.mn.us • 651-296-6300 • 800-657-3864 • TTY 651•282-5332 or 800-657-3864 • Available in alternative formats <br /> wq-strm3-28 • 11/7/11 Page 5 of 7 <br />