My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: sewer meeting
Orono
>
Property Files
>
Street Address
>
S
>
Shevlin Dr
>
2145 Shevlin Dr - 03-117-23-34-0005
>
Correspondence
>
Re: sewer meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:37:10 PM
Creation date
10/24/2018 10:56:32 AM
Metadata
Fields
Template:
Address
House Number
2145
Street Name
Shevlin
Street Type
Drive
Address
2145 Shevlin Dr
Document Type
Correspondence
PIN
0311723340005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� w <br /> � O� <br /> O �� O <br /> ���:T-� CI Y of ORONO <br /> � ���� � <br /> ,� '! �..,�=� ,�ti M����� ot��� <br /> t a, <br /> �,� �'��� �`�.`yG Stree3 Addross: Mailln�Addross: <br /> '�c'E'`SBog' <br /> 2750 Kelley Parkw P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323•0066 <br /> Apri128, 1998 <br /> Dear Project Area Residents; <br /> The City of Orono has scheduled a Neighborhood Info ational Meeting to obtain resident <br /> comments on a proposad sanitary sewer project to serve the Webber Hills Neighborhood. A <br /> project area map is included with this notice. This Neighb rhood Meeting will be held at 7:00 <br /> P.M. Tuesday, May 19th at the Orono City Council C bers. <br /> Introduction <br /> This area was included in the recent MUSA expansion for nitary sewer installation because of <br /> the smaller lot sizes and alder septic systems with limited re lacement sites available. Installation <br /> of new code compliant septic systems will be difficult on s me of the lots in this neighborhood <br /> and system replacements will result in the loss of numero s trees. Approximately 75% of the <br /> existing septic systems in this neighborhood are non-conf ' g with several systems in near <br /> failing condition. This area is one of ten neighborhoods inclu ed in the recent MUSA expansion. <br /> Sewer projects have already been completed in four areas wi an additional two areas scheduled <br /> for completion this summer. We are beginning the planning process for possible 1999 projects. <br /> At this time, interest rates are low providing for more affor able projects. <br /> Project Assessments and Costs <br /> A feasibility study has be�n completed with an estimated roject cost of $961,000 in 1998 <br /> dollars. This results in a pr�posed project assessment of$26, 00 per unit payable over a fifteen <br /> year period. Options for p�jepayment of the assessment are a ailable. Based on several projects <br /> recently completed, the estiriiated interest rate is 6.25%. Base on a 15-year assessment at 6.25% <br /> interest, the annual assessm�nt payments will be approximate $2,700. These project costs and <br /> assessment payments may vary dependent on future construct on costs and interest rates. <br /> 'ilelephone (612) 473-7357 • FAX 47 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.