Laserfiche WebLink
Christine Mattson <br /> From: Adam Edwards <br /> Sent: Friday,January 13, 2017 4:24 PM <br /> To: Christine Mattson; Roger Peitso <br /> Cc: Melanie Curtis <br /> Subject: RE:2800 Shadywood Road/#2017-00020 <br /> Chris, <br /> I've reviewed the subject grading plan. <br /> 1. I believe the applicant will need a flood plain alteration permit from the Watershed if they have not already <br /> obtained one. A copy of the permit should be received by the city prior to the issuance of the building permit. <br /> 2. A separate utility permit will be required for the sewer connection. <br /> 3. Perimeter sediment control measures should be installed by the Contractor and inspected by the City prior to <br /> any work, including demolition.Contractor must provide minimum 24 hour notice prior to inspection. <br /> Adam <br /> From:Christine Mattson <br /> Sent: Friday,January 13, 2017 2:43 PM <br /> To:Adam Edwards<aedwards@ci.orono.mn.us>; Roger Peitso<rpeitso@ci.orono.mn.us> <br /> Subject:2800 Shadywood Road/#2017-00020 <br /> We received a building permit application for a new single family house and detached garage. Please review and <br /> provide comments. Thank you! <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway I Orono I MN � 55356(physica/address) <br /> PO Box 66 � Crystal Bay I MN I 55323-0066(mailing addressJ <br /> '� 952.249.4620 I 8 952.249.4616 <br /> � cmattson@ci.orono.mn.us � � www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> OUR OFFICE WILL BE CLOSED: Monday,January 16,2017 <br /> Monday, February 20, 2017 <br /> i <br />