Laserfiche WebLink
� <br /> � <br /> MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY �/ RF���� <br /> Division of Construction Services C,�T �� 2� �� <br /> REPORT ON PLANS yQ� 2�OS <br /> Plans and specifications on plumbing: Caribou Coffee Store No. 01-1180, 2377 Shadywood Road, Orono, pRONO <br /> Hennepin County, Minnesota, Plan No. 060133 <br /> OWNERSHIP: Caribou Coffee, 3900 Lakebreeze Avenue North, Brooklyn Center, Minnesota 55429 <br /> SUBMITTER(S): Buchman Plumbing Company, Inc., P.O. Box 11070, Minneapolis, Minnesota 55412 <br /> Plans Dated: June 21, 2005 <br /> Date Received: Ju1_y 12, 2005 <br /> Date Reviewed: July 25> 2005 <br /> SCOPE: This review is limited to the design of this particular project only insofar as the provisions of the <br /> Minnesota Plumbing Code, as amended, apply, and does not cover the water supply or sewerage system to which <br /> this plumbing system is connected. The review is based upon the supposition that the data on which the design is <br /> based are correct, and that necessary legal authority has been obtained to construct the project. The <br /> responsibility for the design of structural features and the efficiency of equipment must be taken by the project <br /> designer. Approval is contingent upon satisfactory disposition of any requirements included in this report. <br /> Special care should be taken to insure that the material and installation of the plumbing system are in accordance <br /> with the provisions of the Minnesota Plumbing Code. A copy of the approved plans and specifications should <br /> be retained at the project location for future reference. <br /> INSPECTIONS: All plumbing installations must be tested and inspected in accordance with the requirements of <br /> the Minnesota Plumbing Code. As specified in Minnesota Rules, part 4715.2830, no plumbing work may be <br /> covered prior to completing the required tests and inspections. Provisions must be made for applying an air test <br /> at the time of the roughing-in inspection as outlined in Minnesota Rules, part 47152820, subpart 2, of the code. <br /> A manometer test, as specified in Minnesota Rules, part 4715.2820, subpart 3, is required at the time of the <br /> finished plumbing inspection. It is the responsibility of the contractor/installer to notify the Minnesota <br /> Department of Labor and Industry when an installation for a state contract job, licensed facility, or project in an <br /> area where there is no local administrative authority is ready for an inspection and test. To schedule inspections, <br /> contact the state plumbing standards representative for your region, or call the metro office inspection hotline at <br /> 1-800-926-6216 (730 a.m to 9 a.m), or 651/215-0836 (8 a.m to 9 a.m) on Monday, Wednesday or Friday. <br /> REQUIREMENT(S): <br /> 1. The water softener receptor, the dipper well receptors, and the water cooled ice maker receptor must be <br /> individually vented. The trap-to-vent distance must meet the requirements of Minnesota Rules, <br /> part 4715.2620, subpart 4. <br /> 2. Air gaps from indirect wastes must be at least twice the effective opening of the indirect waste pipe(see <br /> Minnesota Rules, part 4715.1570). <br /> 3. Pot or scullery sinks must be provided with waste outlets not less than 2 inches in diameter(see Minnesota <br /> Rules, part 4715.1390, subpart 1). <br /> 4. A full-size vent stack(3-inch minimum) must be provided for every building (see Minnesota Rules, <br /> part 4715.2520, subpart 1). This stack must be continuous in size from its base to its terminal and should be <br /> the most remote stack from the location where the building drain leaves the building. Verify that a full-size <br /> stack e�sts in the building. <br />