My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: grading plan
Orono
>
Property Files
>
Street Address
>
S
>
Shadywood Road
>
2100 Shadywood Road - 17-117-23-31-0041
>
Correspondence
>
Re: grading plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:36:25 PM
Creation date
9/19/2018 9:48:58 AM
Metadata
Fields
Template:
x Address Old
House Number
2100
Street Name
Shadywood
Street Type
Road
Address
2100 Shadywood Road
Document Type
Correspondence
PIN
1711723310041
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � <br /> City ofOrono Page 1 <br /> Building Permit2009-00149 June 23,Z009 <br /> (2) Maintenance is required as follows: <br /> a. When sediment reaches 1/3 the height of the BMP on <br /> perimeter control devices, sediment must be removed <br /> within twenty-four (24) hours of discovery. <br /> b. If the perimeter control device is not functional it must be <br /> repaired or replaced within twenty-four (24) hours of <br /> discovery. <br /> c. Temporary sediment basins shall be maintained when <br /> sediment reaches �/z the outlet height or �/z the basin <br /> storage volume. Basins must be drained or sediment <br /> removed within seventy-two (72) hours of discovery. <br /> d. Sediment must be removed from paved surfaces within <br /> twenty-four (24) hours of discovery. <br /> (3) Erosion into Streets, Wetlands or Water Bodies. If eroded soils <br /> (including tracked soils from construction activities) enter or <br /> appear likely to enter streets, wetlands, or other water bodies, <br /> prevention strategies, cleanup and repair must be immediate with <br /> the appropriate approvals from the DNR, MPCA, or any other <br /> state, federal, or local agencies as necessary. The applicant shall <br /> provide all traffic control and flagging required to protect the <br /> traveling public during cleanup operations. <br /> (4) Erosion Off-Site. If erosion breaches the perimeter of the site, the <br /> applicant shall immediately develop a cleanup and restoration <br /> plan, obtain right-of-entry from the adjoining properly owner and <br /> get appropriate approvals from all state, federal, and local <br /> agencies as necessary. Then implement the cleanup and <br /> restoration plan within forry-eight (48) hours of obtaining the <br /> adjoining property owner's permission and approval from any <br /> appropriate state, federal, and local agencies. <br /> • The $2,000 financial guarantee identified in Section 79-7(b)(2) should be <br /> sufficient for this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.